Assa North-Ohaji South Oil and Gas Project (Nigeria)
From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project. |
Related categories: |
Assa North-Ohaji South Oil and Gas Project is a shut in oil and gas project in Nigeria.
The project consists of the following units:
- Assa North Oil and Gas Field (Nigeria)
- Ohaji South Oil and Gas Field (Nigeria)
Assa North-Ohaji South Oil and Gas Project is also sometimes referred to as ANOH.
Project Details
Main Data
Table 1: Project-level project details for Assa North-Ohaji South Oil and Gas Project
Unit name | Status | Operator | Owner | Discovery year | FID1 year | Production start year | Production type2 |
---|---|---|---|---|---|---|---|
Assa North-Ohaji South | Shut in[1] | Waltersmith Petroman Limited[2] | Waltersmith Petroman Limited (100.0%)[2] | 1992[3] | 2019[4] | 2025 (expected)[4] | Conventional |
Production and Reserves
Table 2: Reserves of Assa North-Ohaji South Oil and Gas Project
Fuel description | Reserves classification | Quantity | Units | Data year | Source |
---|---|---|---|---|---|
condensate | reserves | 197 | million bbl | 2018 | [5] |
crude oil and condensate | Remaining recoverable reserves | 153.84 | million bbl | 2021 | [3] |
gas | Remaining recoverable reserves | 107103.78 | million m³ | 2021 | [3] |
gas | reserves | 56095.14 | million m³ | 2022 | [6] |
nonassociated gas | reserves | 113351.27 | million m³ | 2018 | [5] |
Table 3: Production from Assa North-Ohaji South Oil and Gas Project
Category | Fuel description | Quantity | Units | Data year | Source |
---|---|---|---|---|---|
production design capacity | gas | 3100.67 | million m³/y | 2022 | [7] |
production design capacity | condensate | 16.43 | million bbl/y | 2020 | [8] |
production design capacity | gas | 6201.33 | million m³/y | 2020 | [9] |
Location
Table 4: Project-level location details for Assa North-Ohaji South Oil and Gas Project
Concession/Block | Location | Onshore/Offshore | Coordinates (WGS 84) |
---|---|---|---|
OML 21 (Assa North), OML 53 (Ohaji South)[8] | Onshore, Nigeria[10] | Onshore[11] | 6.8501, 5.438 (exact)[10] |
The map below shows the exact location of the project:
Articles and Resources
Additional Data
To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20240710231255/https://www.nuprc.gov.ng/wp-content/uploads/2024/06/JAN-TO-DEC-2024-PRODUCTION.pdf. Archived from the original (PDF) on 10 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20240716152805/https://www.nuprc.gov.ng/wp-content/uploads/2023/12/Concession-Situation-December-2023.pdf. Archived from the original (PDF) on 16 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20221006063852/https://www.offshore-technology.com/marketdata/assa-north-ohaji-south-anoh-conventional-gas-field-nigeria/. Archived from the original on 06 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.offshore-technology.com/marketdata/oil-gas-field-profile-assa-north-ohaji-south-anoh-conventional-gas-field-nigeria/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "2018 Nigerian Oil And Gas Industry Annual Report" (PDF). Nigerian Department of Petroleum Resources. 2018. Archived (PDF) from the original on April 23, 2021. Retrieved April 14, 2021.
{{cite web}}
: line feed character in|title=
at position 35 (help) - ↑ African Energy Commission (44835). "Africa and Just Energy Transition: Considerations for the Expansion of the African Oil & Gas Domestic Market" (PDF). African Energy Commission. Archived from the original (PDF) on 44972. Retrieved 44972.
{{cite web}}
: Check date values in:|access-date=
,|date=
, and|archive-date=
(help); Invalid|url-status=Live
(help) - ↑ https://web.archive.org/web/20220821204132/https://guardian.ng/news/why-we-stopped-construction-of-gas-development-project-in-imo-by-shell/. Archived from the original on 21 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20230522074026/http://www.nsenergybusiness.com/Projects/Assa-North-Ohaji-South-Project/. Archived from the original on 22 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.nsenergybusiness.com/projects/assa-north-ohaji-south-project/ https://www.pangeaenergyinfo.com/assa-north-ohaji-south-gas-project-will-produce-2400-megawatts-of-electricity/, https://www.nsenergybusiness.com/projects/assa-north-ohaji-south-project/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 10.0 10.1 Eni (2020). "Fact Book 2020, Annex: Exploration & Production - Maps of activity areas" (PDF). Eni. Archived (PDF) from the original on September 14, 2021. Retrieved September 12, 2021.
- ↑ Natural Earth. 45078 https://www.naturalearthdata.com/downloads/10m-physical-vectors/10m-land/. Archived from the original on June 29, 2023. Retrieved June 29, 2023.
{{cite web}}
: Check date values in:|date=
(help); Missing or empty|title=
(help)