Athos Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Blythe Mesa Solar II (Phase 3)
Athos Solar is an operating solar photovoltaic (PV) farm in Desert Center, Riverside County, California, United States.
Project Details
Table 1: Phase-level project details for Athos Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2022[1] | 250 MWac[2] | PV[2] | Intersect Power [100%][3] | Intersect Power[2] |
2 | Operating[2] | 2021[2] | 200 MWac[2] | PV[2] | Intersect Power [100%][4] | Intersect Power[2] |
3 | Operating[5] | 2023[5] | 224 MWac[5] | PV[6] | Intersect Power [100%][7] | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Athos Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Desert Center, Riverside County, California, United States[2] | 33.7513, -115.355 (exact)[2] |
2 | Desert Center, Riverside County, California, United States[2] | 33.7513, -115.355 (exact)[2] |
3 | Riverside County, California, United States[6] | 33.4992, -117.116 (approximate)[6] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206194154/https://www.intersectpower.com/project/athos-i-ii-iii/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220211171336/https://www.intersectpower.com/athos-ii/. Archived from the original on 11 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://www.renewableenergyworld.com/solar/intersect-power-reaches-commercial-operation-of-310-mw-solarstorage-project-in-california/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://web.archive.org/web/20240207123252/https://pv-magazine-usa.com/2021/11/18/intersect-power-lines-up-2-6b-in-financing-for-solar-portfolio-buildout/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206194152/https://www.power-technology.com/marketdata/power-plant-profile-veneto-nearshore-wind-farm-italy/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)