Atyrau 2 power station (ПГУ в Атырау) is a power station in pre-construction in Atyrau, Kazakhstan.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Atyrau 2 power station Atyrau, Atyrau, Kazakhstan 47.09571, 51.92085 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Pre-construction[2][3][4] fossil gas: natural gas[4] 250[3][4] combined cycle[3][4] not found 2028 (planned)[3]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name
1

Background

Construction of the new plant was included into the "2035 Electric Power Industry Development Plan" released by the Ministry of Energy of Kazakhstan in February 2024.[5] In July 2024, the project was listed in the "National Infrastructure Plan of the Republic of Kazakhstan until 2029". According to the document, the project will be implemented in 2025-2028 with the help of private investors. The cost of the project is estimated at KZT 170 billion.[6]

An auction for the construction of the plant was held in August 2024.[7]

Articles and Resources

References

  1. https://www.google.com/maps/place/Atyrau,+Kazakhstan/@47.0972289,51.8537303,12z/data=!3m1!4b1!4m6!3m5!1s0x41a3ea26f5b2dd0d:0x3e4a125c0e268d2d!8m2!3d47.0944959!4d51.9238373!16zL20vMDE1MXN4?entry=ttu. {{cite web}}: Missing or empty |title= (help)
  2. https://lsm.kz/kazahstan-ozelenyat-za-trilliony-tenge. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://adilet.zan.kz/rus/docs/P2400000606. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 "План мероприятий по развитию электроэнергетической отрасли Казахстана до 2035 года". gov.kz. 2024-02-20. Archived from the original on 2024-04-17. Retrieved April 4, 2024.
  5. https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024. {{cite web}}: Missing or empty |title= (help)
  6. "Об утверждении Национального инфраструктурного плана Республики Казахстан до 2029 года (Russian)". Adilet. July 25, 2024. Retrieved October 30, 2024.{{cite web}}: CS1 maint: url-status (link)