Atyrau 2 power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Atyrau 2 power station (ПГУ в Атырау) is an announced power station in Atyrau, Kazakhstan.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Atyrau 2 power station | Atyrau, Atyrau, Kazakhstan | 47.09571, 51.92085 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
1 | Announced[2] | fossil gas: natural gas[2] | 250[2] | combined cycle[2] | 2027 (planned)[2] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name |
---|
1 |
Project-level captive use details
- Captive industry: Oil & Refining[2]
Background
Construction of the new plant was included into the "2035 Electric Power Industry Development Plan" released by the Ministry of Energy of Kazakhstan in February 2024.[3] In July 2024, the project was listed in the "National Infrastructure Plan of the Republic of Kazakhstan until 2029". According to the document, the project will be implemented in 2025-2028 with the help of private investors. The cost of the project is estimated at KZT 170 billion.[4]
An auction for the construction of the plant was held in August 2024.[5]
Articles and Resources
References
- ↑ https://www.google.com/maps/place/Atyrau,+Kazakhstan/@47.0972289,51.8537303,12z/data=!3m1!4b1!4m6!3m5!1s0x41a3ea26f5b2dd0d:0x3e4a125c0e268d2d!8m2!3d47.0944959!4d51.9238373!16zL20vMDE1MXN4?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Об утверждении Национального инфраструктурного плана Республики Казахстан до 2029 года (Russian)". Adilet. July 25, 2024. Retrieved October 30, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Казахстан озеленят за триллионы тенге (Russian)". LS. September 5, 2024. Retrieved October 31, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.