Atyrau CHP power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Atyrau CHP power station (Атырауская ТЭЦ, АТЭЦ) is an operating power station of at least 400-megawatts (MW) in Atyrau, Kazakhstan with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Atyrau CHP power station Atyrau, Atyrau, Kazakhstan 47.081773, 51.942246 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 11, 12, 13, 5, 6, 6R, 7: 47.081773, 51.942246

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
11 Operating[2] fossil gas: natural gas, fossil liquids: fuel oil[3] 100[2][4] gas turbine[2] yes[5] 2015[5][2]
12 Operating[6] fossil gas: natural gas, fossil liquids: fuel oil[7][8] 60[7][6] gas turbine[7][6] yes[8] 2017[7]
13 Operating[9] fossil gas: natural gas, fossil liquids: fuel oil[8] 65[9] gas turbine[9] yes[8] 2023[9]
5 Operating[8] fossil gas: natural gas, fossil liquids: fuel oil[8][10][11] 60[12] steam turbine[12] yes[8] 1969[5][12]
6 Operating[8][9] fossil gas: natural gas, fossil liquids: fuel oil[8][10][11] 60[9][12][13] steam turbine[9][12] yes[8] 1980[13][14] 2024 (planned)[9][15]
6R Pre-construction[9][16][17][15] fossil gas: natural gas, fossil liquids: heavy fuel oil[16][6] 65[9][15] steam turbine[9][15] yes[8] 2024 (planned)[9][16][15]
7 Operating[8] fossil gas: natural gas, fossil liquids: fuel oil[8][10][11] 55[12][13] steam turbine[12] yes[8] 1980[13][14]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
11 Atyrau Thermal Power Plant JSC [100%][8] Atyrau Power LLC [91.0%]; Energoinvest LTD LLC [9.0%]
12 Atyrau Thermal Power Plant JSC [100%][8] Atyrau Power LLC [91.0%]; Energoinvest LTD LLC [9.0%]
13 Atyrau Thermal Power Plant JSC [100%][8] Atyrau Power LLC [91.0%]; Energoinvest LTD LLC [9.0%]
5 Atyrau Thermal Power Plant JSC [100%][8] Atyrau Power LLC [91.0%]; Energoinvest LTD LLC [9.0%]
6 Atyrau Thermal Power Plant JSC [100%][8] Atyrau Power LLC [91.0%]; Energoinvest LTD LLC [9.0%]
6R Atyrau Thermal Power Plant JSC [100%][8] Atyrau Power LLC [91.0%]; Energoinvest LTD LLC [9.0%]
7 Atyrau Thermal Power Plant JSC [100%][8] Atyrau Power LLC [91.0%]; Energoinvest LTD LLC [9.0%]

Backgorund

In October 2023, during his visit to the Atyrau region, Minister of Energy of Kazakhstan Almasadam Satkaliyev announced expansion of the Atyrau CHP power station.[18][19] According to the "Electric Power Industry Development Plan until 2035" released by the Ministry of Energy in February 2024, a new generation unit will be built to replace an older unit and will be commissioned in 2024.[20]

In the fall of 2023, the Ministry of Energy of the Republic of Kazakhstan and the Atyrau power station signed an investment agreement for the expansion and modernization of main equipment with an increase in the total electrical capacity by 130 MW. In 2023, a new turbine Unit 13 with a capacity of 65 MW was put into operation at the thermal power plant, and it is also planned to replace Unit 6 (60 MW) with Unit 6R (65 MW). According to the government of the Atyrau region, the process is expected to be completed in 2025. In addition, in 2024-2026 it is planned to commission new equipment - boiler Unit 15 and turbine Unit 11 with a capacity of 25 MW each.[18][21]

In July 2024, the project was listed in the "National Infrastructure Plan of the Republic of Kazakhstan until 2029". The cost of the project is estimated at KZT 8.2 billion.[22] In July 2024, the construction was in progress.[23]

Articles and Resources

References

  1. https://web.archive.org/web/20210702222016/https://www.industryabout.com/country-territories-3/2030-kazakhstan/fossil-fuels-energy/31022-atyrau-gas-power-plant. Archived from the original on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20220616010455/https://azh.kz/ru/news/view/33262. Archived from the original on 16 June 2022. {{cite web}}: Missing or empty |title= (help)
  3. http://www.ahps.kz/about-the-company/company-history.htm. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20221120135649/http://energo-cis.ru/wyswyg/file/news/%D0%AD%D0%BD%D0%B5%D1%80%D0%B3%D0%BE%D1%81%D0%B8%D1%81%D1%82%D0%B5%D0%BC%D0%B0_%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0.pdf. Archived from the original (PDF) on 20 November 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 (PDF) https://web.archive.org/web/20210709181313/https://info.aues.kz/diploms/2019/tef/pte/Uahitov_AUES.pdf. Archived from the original (PDF) on 09 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://web.archive.org/web/20221128142818/http://www.ahps.kz/about-the-company/company-history.html. Archived from the original on 28 November 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://web.archive.org/web/20210709183044/https://bbgl.ru/news/9487. Archived from the original on 09 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 8.18 8.19 8.20 https://web.archive.org/web/20221128142818/http://www.ahps.kz/about-the-company/company-history.html. Archived from the original on 28 November 2022. {{cite web}}: Missing or empty |title= (help)
  9. 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 https://eenergy.media/news/28458. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 (PDF) https://web.archive.org/web/20210702231008/https://esmap.org/sites/default/files/esmap-files/Rpt_199b97_kazakvol2.pdf. Archived from the original (PDF) on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. 11.0 11.1 11.2 https://web.archive.org/web/20221107195728/https://atameken.kz/files/orc/%D0%9E%D0%A0%D0%9A%20%D0%AD%D0%BD%D0%B5%D1%80%D0%B3%D0%B5%D1%82%D0%B8%D0%BA%D0%B0.docx. Archived from the original on 07 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 12.6 (PDF) https://web.archive.org/web/20210702223831/https://www.econstor.eu/bitstream/10419/103976/1/799687847.pdf. Archived from the original (PDF) on 02 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 https://web.archive.org/web/20220526110324/https://bbgl.ru/station/589. Archived from the original on 26 May 2022. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 (PDF) https://web.archive.org/web/20210709175728/https://info.aues.kz/diploms/2020/itet/pte/Kudrenko_AUES.pdf. Archived from the original (PDF) on 09 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 15.4 https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 https://web.archive.org/web/20231019145120/https://pricom.kz/obshhestvo/chto-bylo-skazano-o-tek.html. Archived from the original on 19 October 2023. {{cite web}}: Missing or empty |title= (help)
  17. https://24.kz/ru/news/social/item/621064-novuyu-gazoturbinnuyu-ustanovku-postroyat-v-atyrauskoj-oblasti. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 October 6, 2023. "НОВУЮ ГАЗОТУРБИННУЮ УСТАНОВКУ ПОСТРОЯТ В АТЫРАУСКОЙ ОБЛАСТИ". Хабар 24. Retrieved November 2, 2023.{{cite web}}: CS1 maint: url-status (link)
  19. "Что было сказано о ТЭК Все права защищены. Используйте активную ссылку на pricom.kz https://pricom.kz/obshhestvo/chto-bylo-skazano-o-tek.html". pricom.kz. October 10, 2023. Retrieved November 2, 2023. {{cite web}}: External link in |title= (help); line feed character in |title= at position 23 (help)CS1 maint: url-status (link)
  20. "План мероприятий по развитию электроэнергетической отрасли до 2035 года". www.gov.kz. February 20, 2024. Retrieved April 4, 2024.{{cite web}}: CS1 maint: url-status (link)
  21. "Can we curb the energy crisis?". eenergy.media. January 30, 2024. Retrieved April 5, 2024.{{cite web}}: CS1 maint: url-status (link)
  22. "Об утверждении Национального инфраструктурного плана Республики Казахстан до 2029 года (Russian)". Adilet. July 25, 2024. Retrieved October 30, 2024.{{cite web}}: CS1 maint: url-status (link)
  23. "Вице-министр энергетики Сунгат Есимханов посетил энергопредприятия Атырауской области". Instagram. July 17, 2024. Retrieved November 1, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.