Atyrau Oil Refinery power station (газотурбинная электростанция ТОО "Атырауский НПЗ") is an announced power station in Kazakhstan.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Atyrau Oil Refinery power station | Kazakhstan | 47.073528, 51.925696 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1: 47.073528, 51.925696
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Announced[2][3][4][5] | fossil gas: natural gas[3] | 154[5] | gas turbine[2][3] | no[3][4] | 2026 (planned)[4][5] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Atyrau Oil Refinery LLP[3][5] | National Company KazMunayGas JSC |
Project-level captive use details
- Captive industry use (heat or power): power[6][3][4]
- Captive industry: Oil & Refining[6][3][4]
- Non-industry use: power[6][3][4]
Background
The plant will be built next to the Atyrau Oil Refinery to provide reliability of electricity supply for the refinery.[7][8] According to the 2035 Electric Power Industry Development Plan released by the Ministry of Energy of Kazakhstan in February 2024, the oil refinery will secure financing for the construction on its own. The power station will have a capability to operate in an isolated mode.[9]
In July 2024, the project was listed in the National Infrastructure Plan of the Republic of Kazakhstan until 2029. According to the document, the plant will be commissioned in 2026. The cost of the project is estimated at KZT 110 billion.[10] In August 2024, negotiations were underway regarding the establishment of partnership agreements.[8]
Articles and Resources
References
- ↑ https://www.google.com/maps/search/atyrau+oil+refinery/@47.0747273,51.9143918,15z?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://tengrinews.kz/kazakhstan_news/kakie-proektyi-vnedryayutsya-na-atyirauskom-npz-512165/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://24.kz/ru/news/social/item/621064-novuyu-gazoturbinnuyu-ustanovku-postroyat-v-atyrauskoj-oblasti.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20231019145120/https://pricom.kz/obshhestvo/chto-bylo-skazano-o-tek.html. Archived from the original on 19 October 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://ru.sputnik.kz/20231018/kazmunaygaz-vmeste-s-kitayskoy-cncec-postroyat-elektrostantsiyu-na-atyrauskom-npz-39450980.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Что было сказано о ТЭК (Russian)". pricom.kz. October 10, 2024. Retrieved October 20, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 8.0 8.1 "Атырауский НПЗ построит газотурбинную электростанцию мощностью 154 МВт (Russian)". energyland.info. August 5, 2024. Retrieved October 30, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Об утверждении Национального инфраструктурного плана Республики Казахстан до 2029 года (Russian)". Adilet. July 25, 2024. Retrieved October 30, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.