Augustus Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Augustus Oil Pipeline is an operating oil pipeline in the USA.[1]

Location

The pipeline is approximately 75 miles long, connecting Midland, Texas, to Crane, Texas, USA.

Loading map...

Project details

  • Operator: Centurion Pipeline[1]
  • Owner: Centurion Pipeline[1]
  • Parent company: Centurion Pipeline[1]
  • Capacity: 150,000 barrels per day[1]
  • Length: 75 miles[1]
  • Diameter: 18, 20 inches[2]
  • Status: Operating[1]
  • Start year: 2020[1]

Background

The pipeline includes 30 miles of new 20-inch pipeline from Midland to Ector, Texas, and 45-miles of existing 18-inch pipeline from Ector, Texas to Crane, Texas. It began operations in the fourth quarter of 2020.[1][2]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 U.S. liquids pipeline projects, Energy Information Administration, Jun. 7, 2021, accessed Aug. 25, 2021.
  2. 2.0 2.1 "Centurion Pipeline places August Pipeline in service". NA Pipelines. Retrieved 2022-02-22.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles