Augustynka solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Augustynka solar farm is a solar photovoltaic (PV) farm in pre-construction in Siemiatycze County, Podlaskie Voivodeship, Poland.

Project Details

Table 1: Phase-level project details for Augustynka solar farm

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2023 (planned)[1] 25 MW[2] PV[3] PGE Energia Odnawialna SA[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Augustynka solar farm

Location Coordinates (WGS 84)
Siemiatycze County, Podlaskie Voivodeship, Poland[3] 52.4451, 23.1261 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://renewablesnow.com/news/pge-gets-permits-to-build-107-mw-of-pv-plants-in-eastern-poland-812643/. {{cite web}}: Missing or empty |title= (help)
  2. https://pgeeo.pl/aktualnosci/nowy-artykul4. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://polanddaily24.com/pge-starts-the-construction-of-one-of-polands-largest-photovoltaic-farms/business/15068. {{cite web}}: Missing or empty |title= (help)