Aurora Energy Project solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Vast Solar Port Augusta Concentrated Solar Thermal Power Project (Phases 2, 3), VS1 (Phases 2, 3)
Aurora Energy Project solar farm is a solar photovoltaic (PV) and solar thermal farm in pre-construction in Port Augusta, South Australia, Australia.
Project Details
Table 1: Phase-level project details for Aurora Energy Project solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Pre-construction[1] | – | 70 MW[2][3] | PV[4] | 1414 Degrees [50%]; Vast Solar PTY LTD [50%][1][1] | Vast Solar PTY LTD; 1414 Degrees[1][1] |
2 | Pre-construction[5] | 2025 (planned)[5] | 30 MWac[6] | Solar Thermal[6] | 1414 Degrees [50%]; Vast Solar PTY LTD [50%][6][6] | – |
3 | Announced[6] | – | 120 MWac[6] | Solar Thermal[6] | 1414 Degrees [50%]; Vast Solar PTY LTD [50%][6][6] | – |
Location
Table 2: Phase-level location details for Aurora Energy Project solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Port Augusta, South Australia, Australia[1] | -32.4909, 137.764 (approximate)[1] |
2 | Port Augusta, Port Augusta City Council, South Australia, Australia[1] | -32.4909, 137.764 (approximate)[1] |
3 | Port Augusta, South Australia, Australia[5] | -32.489, 137.7106 (approximate)[5] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 (PDF) https://web.archive.org/web/20240206153627/https://1414degrees.com.au/wp-content/uploads/2022/06/14D-15June.pdf. Archived from the original (PDF) on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207073210/https://reneweconomy.com.au/aurora-project-could-start-life-as-big-battery-as-1414-rethinks-business-case/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207073324/https://www.pv-magazine.com/2019/12/02/australias-1414-degrees-to-supply-abandoned-aurora-csp-site-with-pv-thermal-storage/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207134903/https://1414degrees.com.au/auroraenergyproject/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240207100713/https://arena.gov.au/projects/vast-solar-port-augusta-concentrated-solar-thermal-power-project/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 https://web.archive.org/web/20240207073311/https://www.solarpaces.org/vast-solar-to-grow-port-augusta-csp-to-150-mw-at-old-solarreserve-site/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)