Other names: Vast Solar Port Augusta Concentrated Solar Thermal Power Project (Phases 2, 3), VS1 (Phases 2, 3)

Aurora Energy Project solar farm is a solar photovoltaic (PV) and solar thermal farm in pre-construction in Port Augusta, South Australia, Australia.

Project Details

Table 1: Phase-level project details for Aurora Energy Project solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 70 MW[2][3] PV[4] 1414 Degrees [50%]; Vast Solar PTY LTD [50%][1][1] Vast Solar PTY LTD; 1414 Degrees[1][1]
2 Pre-construction[5] 2025 (planned)[5] 30 MWac[6] Solar Thermal[6] 1414 Degrees [50%]; Vast Solar PTY LTD [50%][6][6]
3 Announced[6] 120 MWac[6] Solar Thermal[6] 1414 Degrees [50%]; Vast Solar PTY LTD [50%][6][6]

Location

Table 2: Phase-level location details for Aurora Energy Project solar farm

Phase Name Location Coordinates (WGS 84)
1 Port Augusta, South Australia, Australia[1] -32.4909, 137.764 (approximate)[1]
2 Port Augusta, Port Augusta City Council, South Australia, Australia[1] -32.4909, 137.764 (approximate)[1]
3 Port Augusta, South Australia, Australia[5] -32.489, 137.7106 (approximate)[5]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 (PDF) https://web.archive.org/web/20240206153627/https://1414degrees.com.au/wp-content/uploads/2022/06/14D-15June.pdf. Archived from the original (PDF) on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240207073210/https://reneweconomy.com.au/aurora-project-could-start-life-as-big-battery-as-1414-rethinks-business-case/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. https://web.archive.org/web/20240207073324/https://www.pv-magazine.com/2019/12/02/australias-1414-degrees-to-supply-abandoned-aurora-csp-site-with-pv-thermal-storage/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20240207134903/https://1414degrees.com.au/auroraenergyproject/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240207100713/https://arena.gov.au/projects/vast-solar-port-augusta-concentrated-solar-thermal-power-project/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 https://web.archive.org/web/20240207073311/https://www.solarpaces.org/vast-solar-to-grow-port-augusta-csp-to-150-mw-at-old-solarreserve-site/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)