Avtozavod power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Avtozavod power station (Автозаводская ТЭЦ) is an operating power station of at least 480-megawatts (MW) in Nizhny Novgorod, Nizhny Novgorod Oblast, Russia with multiple units, some of which are not currently operating. It is also known as Gorky Motor Works CHP.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Avtozavod power station | Nizhny Novgorod, Nizhny Novgorod Oblast, Russia | 56.242864, 43.892311 (exact)[1][2] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 10, 11, 12, 7, 8, 9, CC1: 56.242864, 43.892311
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
10 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 60[6][7] | steam turbine[6][7] | yes[3] | 1976[6][7] |
11 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 60[6][7] | steam turbine[6][7] | yes[3] | 1976[6][7] |
12 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 100[6][7] | steam turbine[6][7] | yes[3] | 1978[6][7] |
7 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 100[6][7] | steam turbine[6][7] | yes[3] | 1965[6][7] |
8 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 100[6][7] | steam turbine[6][7] | yes[3] | 1966[6][7] |
9 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 60[6][7] | steam turbine[6][7] | yes[3] | 1974[6][7] |
CC1 | Shelved[8][4][9][10][11][3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[11] | 440[11] | combined cycle[11][8] | yes[11] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
10 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
11 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
12 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
7 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
8 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
9 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
CC1 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
Background
New construction (CC1)
The project had been announced to be frozen until 2021 in 2015.[12] There have been no updates since 2021. The project was not included in the scheme and program for the development of the Unified Energy System of Russia for 2022-2028[13] or the Russian Ministry of Energy 2023-2028 energy program issued in February 2023.[14] As of November 2023, the project is considered shelved. In September 2023, En+ Group had to abandon another modernization project, which aimed to increase the installed capacity of the power station by 60 MW. The cancellation was attributed to the escalated project costs.[15]
Modernization (Unit 9)
In February 2020, the modernization of Unit 9 (without replacement of the turbine) by April 2025 was approved by the Government of Russia.[16] In February 2025, the project was cancelled by the owner. The justification for the cancellation of the project was the rising equipment costs and the expected negative impact on the company's financial results.[17]
Articles and Resources
References
- ↑ https://web.archive.org/web/20210830234108/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32775-avtozavodskaya-gas-power-plant. Archived from the original on 2021-08-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://energybase.ru/power-plant/Avtozavodskaya_CHP-1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 https://web.archive.org/web/20210830213624/https://enplusgroup.com/en/company/map/avtozavodskaya-chp/. Archived from the original on 2021-08-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 (PDF) https://web.archive.org/web/20230313040439/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/31_Nizhegorodskaja_oblast_fin.pdf. Archived from the original (PDF) on 2023-03-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20210830222414/https://old.volgaenergo.ru/o_kompanii/novosti/novosti_kompanii/detail.php?id=105. Archived from the original on 2021-08-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 (PDF) https://web.archive.org/web/20211123173128/https://admgor.nnov.ru/uploads/editor/20/a7/gl1.pdf. Archived from the original (PDF) on 2021-11-23.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 https://web.archive.org/web/20220605045016/https://ru.wikipedia.org/wiki/%D0%90%D0%B2%D1%82%D0%BE%D0%B7%D0%B0%D0%B2%D0%BE%D0%B4%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 2022-06-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 http://pravo.gov.ru/proxy/ips/?docbody=&prevDoc=102414460&backlink=1&&nd=102405847.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210909162220/https://www.nta-nn.ru/news/economy/2015/news_535161/. Archived from the original on 2021-09-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220708160248/https://www.reuters.com/article/orubs-eurosibenergo-station-coal-idRUKBN0M11EJ20150305. Archived from the original on 2022-07-08.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 https://web.archive.org/web/20210909171250/https://government-nnov.ru/?id=195507. Archived from the original on 2021-09-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Слабый рубль заморозил проект ТЭЦ Евросибэнерго, поднял экспорт угля". Reuters.com. Mar 5, 2015. Retrieved Apr 25, 2022.
- ↑ "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"".
{{cite web}}
: CS1 maint: url-status (link) - ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ НИЖЕГОРОДСКАЯ ОБЛАСТЬ" (PDF). SO UPS of Russia. February 28, 2023. Retrieved December 5, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Минэнерго согласилось снизить штрафы за отказ от проектов КОММод на 55–65%". peretok.ru. September 24, 2023. Retrieved December 5, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Распоряжение Правительства Российской Федерации от 07.02.2020 № 232-р". Официальное опубликование правовых актов. February 7, 2020. Retrieved March 19, 2025.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Правительство одобрило отказ от 15 проектов модернизации российских электростанций". MESHNEWS. February 14, 2025. Retrieved March 19, 2025.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.