Avtozavod power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Avtozavod power station (Автозаводская ТЭЦ) is an operating power station of at least 480-megawatts (MW) in Nizhny Novgorod, Nizhny Novgorod Oblast, Russia with multiple units, some of which are not currently operating. It is also known as Gorky Motor Works CHP.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Avtozavod power station | Nizhny Novgorod, Nizhny Novgorod Oblast, Russia | 56.242864, 43.892311 (exact)[1][2] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 10, 11, 12, 7, 8, 9, CC1: 56.242864, 43.892311
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
10 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 60[6][7] | steam turbine[6][7] | yes[3] | 1976[6][7] |
11 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 60[6][7] | steam turbine[6][7] | yes[3] | 1976[6][7] |
12 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 100[6][7] | steam turbine[6][7] | yes[3] | 1978[6][7] |
7 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 100[6][7] | steam turbine[6][7] | yes[3] | 1965[6][7] |
8 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 100[6][7] | steam turbine[6][7] | yes[3] | 1966[6][7] |
9 | Operating[3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5] | 60[6][7] | steam turbine[6][7] | yes[3] | 1974[6][7] |
CC1 | Shelved[8][4][9][10][11][3] | fossil gas: natural gas, fossil liquids: heavy fuel oil[11] | 440[11] | combined cycle[11][8] | yes[11] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
10 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
11 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
12 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
7 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
8 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
9 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
CC1 | Avtozavodskaya CHP LLC [100%][2] | En+ Group [100.0%] |
Background
The project has been announced to be frozen until 2021 in 2015.[12] There have been no updates since 2021. The project was not included in the scheme and program for the development of the Unified Energy System of Russia for 2022-2028[13] or the Russian Ministry of Energy 2023-2028 energy program issued in February 2023.[14] As of November 2023, the project is considered shelved. In September 2023, En+ Group had to abandon another modernization project, which aimed to increase the installed capacity of the power station by 60 MW. The cancellation was attributed to the escalated project costs.[15]
Articles and Resources
References
- ↑ https://web.archive.org/web/20210830234108/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32775-avtozavodskaya-gas-power-plant. Archived from the original on 30 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://energybase.ru/power-plant/Avtozavodskaya_CHP-1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 https://web.archive.org/web/20210830213624/https://enplusgroup.com/en/company/map/avtozavodskaya-chp/. Archived from the original on 30 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 (PDF) https://web.archive.org/web/20230313040439/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/31_Nizhegorodskaja_oblast_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20210830222414/https://old.volgaenergo.ru/o_kompanii/novosti/novosti_kompanii/detail.php?id=105. Archived from the original on 30 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 (PDF) https://web.archive.org/web/20211123173128/https://admgor.nnov.ru/uploads/editor/20/a7/gl1.pdf. Archived from the original (PDF) on 23 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 https://web.archive.org/web/20220605045016/https://ru.wikipedia.org/wiki/%D0%90%D0%B2%D1%82%D0%BE%D0%B7%D0%B0%D0%B2%D0%BE%D0%B4%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 05 June 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 http://pravo.gov.ru/proxy/ips/?docbody=&prevDoc=102414460&backlink=1&&nd=102405847.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210909162220/https://www.nta-nn.ru/news/economy/2015/news_535161/. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220708160248/https://www.reuters.com/article/orubs-eurosibenergo-station-coal-idRUKBN0M11EJ20150305. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 https://web.archive.org/web/20210909171250/https://government-nnov.ru/?id=195507. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "Слабый рубль заморозил проект ТЭЦ Евросибэнерго, поднял экспорт угля". Reuters.com. Mar 5, 2015. Retrieved Apr 25, 2022.
- ↑ "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"".
{{cite web}}
: CS1 maint: url-status (link) - ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ НИЖЕГОРОДСКАЯ ОБЛАСТЬ" (PDF). SO UPS of Russia. February 28, 2023. Retrieved December 5, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Минэнерго согласилось снизить штрафы за отказ от проектов КОММод на 55–65%". peretok.ru. September 24, 2023. Retrieved December 5, 2023.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.