Ayios Konstantinos solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Ayios Konstantinos solar farm (Αγιος Κωνσταντινος) is a solar photovoltaic (PV) farm in pre-construction in Larisa Regional Unit, Thessaly, Greece.
Project Details
Table 1: Phase-level project details for Ayios Konstantinos solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
1 | Cancelled[1] | 20 MWp/dc[1] | PV[1] | Renewables Valorem Hellas LLC [100%] (Renewables Valorem Hellas Εταιρεια Περιορισμενης Ευθυνης)[2] |
2 | Pre-construction[3][1] | 20 MWp/dc[1] | PV[1] | Renewables Valorem Hellas LLC [100%] (Renewables Valorem Hellas Εταιρεια Περιορισμενης Ευθυνης)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Ayios Konstantinos solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Larisa Regional Unit, Thessaly, Greece[1] | 39.4118, 22.4852 (exact)[1] |
2 | Farsala Municipality, Larisa Regional Unit, Thessaly, Greece[1] | 39.4171, 22.4854 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20240301134205/https://geo.rae.gr/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240507022214/https://renewablesnow.com/news/valorem-wins-enviro-permit-for-300-mw-of-solar-in-greece-843836/. Archived from the original on 07 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)