BM-C-33 Oil and Gas Project (Brazil)
From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project. |
Related categories: |
BM-C-33 Oil and Gas Project is an in development oil and gas project in Brazil.
The project consists of the following units:
BM-C-33 Oil and Gas Project is also sometimes referred to as Raia Manta, Raia Pintada.
Project Details
Main Data
Table 1: Project-level project details for BM-C-33 Oil and Gas Project
Unit name | Status | Operator | Owner | Discovery year | FID* year | Production start year |
---|---|---|---|---|---|---|
BM-C-33 | In development[1] | Equinor[2] | Repsol (35.0%); Petrobras (30.0%); Equinor (35.0%)[3] | 2010[3] | 2023[4] | 2028 (expected)[3] |
Production and Reserves
Table 2: Reserves of BM-C-33 Oil and Gas Project
Fuel Description | Reserve Classification | Quantity | Units | Data Year | Source |
---|---|---|---|---|---|
hydrocarbons | recoverable reserves | 1000 | million boe | 2023 | [3][2] |
Table 3: Production from BM-C-33 Oil and Gas Project
Category | Fuel Description | Quantity | Units | Data Year | Source |
---|---|---|---|---|---|
production design capacity | gas | 5840 | million m³/y | 2028 | [3] |
production design capacity | oil | 45.99 | million bbl/y | 2028 | [2] |
Location
Table 4: project-level location details for BM-C-33 Oil and Gas Project
Concession/Block | Basin | Location | Coordinates (WGS 84) |
---|---|---|---|
BM-C-33[4] | Campos | Offshore, Brazil[5][3] | -23.3356, -40.0259 (exact)[5][3] |
The map below shows the exact location of the project:
Articles and Resources
Additional data
To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20230512042533/https://www.nsenergybusiness.com/news/equinor-takes-fid-9bn-bm-c-33-gas-and-condensate-project-brazil/. Archived from the original on 12 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240108222321/https://www.equinor.com.br/noticias/equinor-submete-declaracoes-de-comercialidade-para-dois-campos-na-area-do-bm-c-33-na-bacia-de-campos. Archived from the original on 08 January 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20230922230944/https://jpt.spe.org/partners-sanction-9-billion-project-off-brazil. Archived from the original on 22 September 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20230531111754/https://www.equinor.com/news/20230508-final-investment-decision-bm-c-33-brazil. Archived from the original on 31 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20240108222102/https://www.equinor.com/news/archive/2012/02/27/downloads/PaodeAcucar_high_impact_discovery_b.pdf.pdf. Archived from the original (PDF) on 08 January 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)