BM-C-33 Oil and Gas Project (Brazil)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

BM-C-33 Oil and Gas Project is an in development oil and gas project in Brazil.


The project consists of the following units:

BM-C-33 Oil and Gas Project is also sometimes referred to as Raia Manta, Raia Pintada.

Project Details

Main Data

Table 1: Project-level project details for BM-C-33 Oil and Gas Project

*Final Investment Decision
Unit name Status Operator Owner Discovery year FID* year Production start year
BM-C-33 In development[1] Equinor[2] Repsol (35.0%); Petrobras (30.0%); Equinor (35.0%)[3] 2010[3] 2023[4] 2028 (expected)[3]

Production and Reserves

Table 2: Reserves of BM-C-33 Oil and Gas Project

million boe = million barrels of oil equivalent
Fuel Description Reserve Classification Quantity Units Data Year Source
hydrocarbons recoverable reserves 1000 million boe 2023 [3][2]

Table 3: Production from BM-C-33 Oil and Gas Project

million m³/y = million cubic meters per year million bbl/y = million barrels of oil per year
Category Fuel Description Quantity Units Data Year Source
production design capacity gas 5840 million m³/y 2028 [3]
production design capacity oil 45.99 million bbl/y 2028 [2]

Location

Table 4: project-level location details for BM-C-33 Oil and Gas Project

Concession/Block Basin Location Coordinates (WGS 84)
BM-C-33[4] Campos Offshore, Brazil[5][3] -23.3356, -40.0259 (exact)[5][3]

The map below shows the exact location of the project:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20230512042533/https://www.nsenergybusiness.com/news/equinor-takes-fid-9bn-bm-c-33-gas-and-condensate-project-brazil/. Archived from the original on 12 May 2023. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240108222321/https://www.equinor.com.br/noticias/equinor-submete-declaracoes-de-comercialidade-para-dois-campos-na-area-do-bm-c-33-na-bacia-de-campos. Archived from the original on 08 January 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20230922230944/https://jpt.spe.org/partners-sanction-9-billion-project-off-brazil. Archived from the original on 22 September 2023. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20230531111754/https://www.equinor.com/news/20230508-final-investment-decision-bm-c-33-brazil. Archived from the original on 31 May 2023. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://web.archive.org/web/20240108222102/https://www.equinor.com/news/archive/2012/02/27/downloads/PaodeAcucar_high_impact_discovery_b.pdf.pdf. Archived from the original (PDF) on 08 January 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)