BM-C-33 Oil and Gas Project (Rio de Janeiro, Brazil)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

BM-C-33 Oil and Gas Project is an in development oil and gas project in Rio de Janeiro, Brazil.


The project consists of the following units:

BM-C-33 Oil and Gas Project is also sometimes referred to as Raia Manta, Raia Pintada, Pão de Açucar.

Project Details

Main Data

Table 1: Project-level project details for BM-C-33 Oil and Gas Project

1Final Investment Decision
Unit name Status Operator Owner Discovery year FID1 year Production start year Production type
BM-C-33 In development[1] Equinor[2] Repsol (35.0%); Petrobras (30.0%); Equinor (35.0%)[3] 2010[3] 2023[4] 2028 (expected)[3] Conventional[4][5]

Production and Reserves

Table 2: Reserves of BM-C-33 Oil and Gas Project

million boe = million barrels of oil equivalent
Fuel description Reserves classification Quantity Units Data year Source
hydrocarbons recoverable reserves 1000 million boe 2023 [3][2]

Table 3: Production from BM-C-33 Oil and Gas Project

million m³/y = million cubic meters per year
million bbl/y = million barrels of oil per year
Category Fuel description Quantity Units Data year Source
production design capacity gas 5840 million m³/y 2028 [3]
production design capacity oil 45.99 million bbl/y 2028 [2]

Location

Table 4: Project-level location details for BM-C-33 Oil and Gas Project

Concession/Block Basin Location Onshore/Offshore Coordinates (WGS 84)
BM-C-33[4] Campos Rio de Janeiro, Brazil[6][3] Offshore[4] -23.3356, -40.0259 (exact)[6][3]

The map below shows the exact location of the project:

Loading map...

Articles and Resources

Additional Data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20230512042533/https://www.nsenergybusiness.com/news/equinor-takes-fid-9bn-bm-c-33-gas-and-condensate-project-brazil/. Archived from the original on 12 May 2023. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240108222321/https://www.equinor.com.br/noticias/equinor-submete-declaracoes-de-comercialidade-para-dois-campos-na-area-do-bm-c-33-na-bacia-de-campos. Archived from the original on 08 January 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20230922230944/https://jpt.spe.org/partners-sanction-9-billion-project-off-brazil. Archived from the original on 22 September 2023. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20230531111754/https://www.equinor.com/news/20230508-final-investment-decision-bm-c-33-brazil. Archived from the original on 31 May 2023. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240108222808/https://www.offshore-technology.com/marketdata/oil-gas-field-profile-pao-de-acucar-conventional-gas-field-brazil/. Archived from the original on 08 January 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 (PDF) https://web.archive.org/web/20240108222102/https://www.equinor.com/news/archive/2012/02/27/downloads/PaodeAcucar_high_impact_discovery_b.pdf.pdf. Archived from the original (PDF) on 08 January 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)