BSH Kilgore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

BSH Kilgore wind farm is a wind farm in pre-construction in Cherry County, Nebraska, United States.

Project Details

Table 1: Phase-level project details for BSH Kilgore wind farm

Phase name Status Nameplate capacity Type Owner
1 Pre-construction[1] 60 MW[2] Onshore[3] Sandhills Wind Energy; Bluestem Energy Solutions[4][4]

Location

Table 2: Phase-level location details for BSH Kilgore wind farm

Phase Name Location Coordinates (WGS 84)
1 Cherry County, Nebraska, United States[3] 42.8944, -101.0108 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240126122638/https://nptelegraph.com/business/state-supreme-court-rulings-dismiss-challenges-to-kilgore-wind-farm/article_db462492-be0b-11ed-a4af-5febc34eea41.html. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125175051/http://www.cherrycountywind.com/projects. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 (PDF) https://web.archive.org/web/20240126081329/https://cherrycountyne.gov/pdfs/planning_zoning/Kilgore%20Project%20Conditional%20Use%20Permit%20App.%20-2.pdf. Archived from the original (PDF) on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240131092031/https://energycentral.com/news/opponents-sandhills-projects-file-lawsuits. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)