Ba Ria power station
From Global Energy Monitor
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Ba Ria power station is an operating power station of at least 389-megawatts (MW) in Long Hương, Ba Ria - Vung Tau, Vietnam with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Ba Ria power station | Long Hương, Ba Ria - Vung Tau, Vietnam | 10.489019, 107.166468 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2: 10.489019, 107.166468
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2][3][4][5] | fossil gas: natural gas[3] | 389[3] | combined cycle[6] | not found | 1999[6] |
2 | Shelved[7][8][9] | fossil gas: LNG[8][9] | 1200[8][9] | unknown | not found | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | EVNGENCO 3 Co [100%][10] | EVNGENCO 3 Co [100.0%] |
2 | – | – |
Articles and Resources
References
- ↑ https://web.archive.org/web/20210310234427/https://www.industryabout.com/country-territories-3/2905-vietnam/fossil-fuels-energy/55180-ba-ria-gas-power-plant. Archived from the original on 10 March 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.genco3.com/Data/Sites/1/media/bao-cao-thuong-nien/2022/20230410-bctn-evngenco3---v4-final.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 (PDF) https://web.archive.org/web/20210311015310/https://en.evn.com.vn/userfile/User/huongbtt/files/2021/1/EVNAnnualReport2018.pdf. Archived from the original (PDF) on 11 March 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220709144121/https://www.genco3.com/Data/Sites/1/media/bao-cao-thuong-nien/2021/20210614_pgv_ar2020---en.pdf. Archived from the original (PDF) on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://www.genco3.com/Data/Sites/1/media/bao-cao-thuong-nien/2022/annual-report-2021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20220709130843/https://www.power-technology.com/marketdata/ba-ria-combined-cycle-power-plant-vietnam/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://vietnamenergy.vn/considering-to-supplement-long-son-power-center-to-the-npp-23819.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20210825214815/https://en.vietnamplus.vn/ba-riavung-tau-seeks-to-develop-lngfueled-power-projects/166947.vnp. Archived from the original on 25 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 https://web.archive.org/web/20240405045547/https://insightplus.bakermckenzie.com/bm/energy-mining-infrastructure_1/vietnam-key-highlights-of-new-draft-of-national-power-development-plan-draft-pdp8. Archived from the original on 05 April 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221002062438/https://www.genco3.com/en-US/operations/production-business. Archived from the original on 02 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.