Bago City Wind Power Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Baog Hybrid Renewable Energy Park wind farm, Bago Hybrid Renewable Energy Park
Bago City Wind Power Project is a wind farm in pre-construction in Bago City, Negros Occidental Province, Philippines.
Project Details
Table 1: Phase-level project details for Bago City Wind Power Project
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2026 (planned)[2] | 50 MW[3] | Onshore[3] | First Maxpower International Corp; Equitrust Holdings Inc; Crosspower Operations GmbH[4] |
2 | Pre-construction[5] | 2026 (planned)[2] | 50 MW[3] | Onshore[3] | First Maxpower International Corp; Equitrust Holdings Inc; Crosspower Operations GmbH[4] |
3 | Pre-construction[5] | 2026 (planned)[2] | 50 MW[3] | Onshore[3] | First Maxpower International Corp; Equitrust Holdings Inc; Crosspower Operations GmbH[4] |
Location
Table 2: Phase-level location details for Bago City Wind Power Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Bago City, Negros Occidental Province, Philippines[3] | 10.5164, 122.9024 (approximate)[3] |
2 | Bago City, Negros Occidental Province, Philippines[3] | 10.5164, 122.9024 (approximate)[3] |
3 | Bago City, Negros Occidental Province, Philippines[3] | 10.5164, 122.9024 (approximate)[3] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_wind_2021-03-31.pdf https://bagoenergy.com/the-project/, https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_wind_2021-03-31.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/06_Visayas_Indicative_apr_3_2024.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 https://web.archive.org/web/20240125191825/https://bagoenergy.com/the-project/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://bagoenergy.com/the-project/, https://bagoenergy.com/the-project/ https://bagoenergy.com/the-project/, https://bagoenergy.com/the-project/, https://bagoenergy.com/the-project/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/06_Visayas_Indicative_apr_3_2024.pdf https://bagoenergy.com/the-project/, https://doe.gov.ph/sites/default/files/pdf/electric_power/06_Visayas_Indicative_apr_3_2024.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)