Baldota Koppal steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Baldota Koppal steel plant, also known as BSPL Koppal, is a steel plant in Hospet, Halavarthi, Koppal, Karnataka, India that operates blast furnace (BF), basic oxygen furnace (BOF), ironmaking, and steelmaking technology.

Location

The map below shows the exact location of the plant in Hospet, Halavarthi, Koppal, Karnataka, India:

Loading map...
  • Location:
  • Coordinates (WGS 84): 15.332616, 76.206778 (exact)

Background

Baldota Steel & Power Limited (BSPL) was founded as part of the Baldota conglomerate. The company announced to construct a steel plant in Koppal district of Karnataka with an annual capacity of 3.5 million tonnes in 2 phases & a 220 MW power plant along with 100 MW solar power.[1]

The project was originally proposed by Aaress Iron and Steel Limited (AISL) in 2019. In July 2021, the company secured environmental clearance for the project. In August 2023, the techno-economic feasibility report was submitted.[1][2] The environmental clearance was transferred from AISL to BPSL in 2024.[3]

The project will need an investment of INR 18,000 Crores and the Phase 1, commissioning is planned by Quarter 2 of 2026.[4]

Plant Details

Table 1: General Plant Details

Announced date Start date Workforce size Power source Iron ore source Coal source
2019[5][6] 2026[7] 10000[8] 220 MW CPP + 100 MW Solar power[5] unknown unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Baldota Steel and Power Ltd 5086866250 E100002004559 Baldota Steel and Power Ltd[5] 5086866250 E100002004559

Table 3: Process and Products

Steel sector end users Main production equipment
unknown BF; BOF; Iron other/unspecified; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 3500[9][5][7][6] 7000[10] 10500[10][7][6][5][9]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Other/unspecified iron capacity Nominal iron capacity (total)
announced 3800[6] 0 3800[6]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Coke Pellets
NF NF NF NF

Unit Details

Table 7: Blast Furnace Details

Unit name Status Announced date Start date Current size Current capacity (ttpa)
unknown BF (1) announced[7][6] 2021[5] 2026[7] 1681.0[6] 1200[6]
unknown BF (2) announced[5][9][6] 2021[5] 3814.0[6] 2600[6]

Table 8: Basic Oxygen Furnace Details

Unit name Status Announced date Start date Current capacity (ttpa) Current size
unknown BOF (1) announced[7][6] 2021[5] 2026[7] 750[9][7][6] 65.0 tonnes[6]
unknown BOF (2) announced[7][6] 2021[5] 2026[7] 750[9][7][6] 65.0 tonnes[6]
unknown BOF (3) announced[9] 2021[5] 1000[9][5][6] 180.0 tonnes[6]
unknown BOF (4) announced[9] 2021[5] 1000[9][5][6] 180.0 tonnes[6]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "The Baldota Group". Baldota. Retrieved 2025-01-20.
  2. "AISPL Environmental Clearance" (PDF). environmentclearance.nic.in. 2021-07-27. Retrieved 2025-02-14.{{cite web}}: CS1 maint: url-status (link)
  3. "Transfer of Environment Clearance". forestsclearance.nic.in. 2024-03-21. Retrieved 2025-02-14.{{cite web}}: CS1 maint: url-status (link)
  4. "BSPL opts for Wrench SmartProject on 3.5 MTPA Project". Wrench Solutions - Project Management Information System. Retrieved 2025-01-20.
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 https://baldota.co.in/bspl. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 (PDF) https://environmentclearance.nic.in/writereaddata/Form-1A/EC/072820211MSPLEC.pdf. {{cite web}}: Missing or empty |title= (help)
  7. 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 https://www.wrenchsp.com/news/bspl-opts-for-wrench-smartproject-on-3-5-mtpa-project/. {{cite web}}: Missing or empty |title= (help)
  8. https://economictimes.indiatimes.com/industry/indl-goods/svs/steel/baldota-group-to-invest-rs-18000-crore-to-build-3-5-mtpa-steel-plant-in-koppal/articleshow/95234261.cms?from=mdr. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 https://www.linkedin.com/posts/nagaraj-nadig-98ba4876_baldota-steel-power-limited-bspl-an-activity-7151639492532084736-X2YS/. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://www.business-standard.com/companies/news/baldota-group-investing-rs-54-000-cr-to-set-up-mega-steel-plant-in-koppal-125021101349_1.html. {{cite web}}: Missing or empty |title= (help)