Baljci wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Baljci wind farm is a wind farm in pre-construction in Tomislavgrad, Bosnia and Herzegovina.

Project Details

Table 1: Phase-level project details for Baljci wind farm

Status Nameplate capacity Type Owner
Pre-construction[1] 48 MW[2] Onshore[2] Tomkup DOO [100%][2]

Location

Table 2: Phase-level location details for Baljci wind farm

Location Coordinates (WGS 84)
Tomislavgrad, Bosnia and Herzegovina[3] 43.7187, 17.2236 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240126132424/https://serbia-energy.eu/bosnia-and-herzegovina-four-wind-farms-are-planned-to-be-commissioned-in-2023-and-2024/?pdf=59192. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125210129/https://balkangreenenergynews.com/draft-energy-permit-adopted-for-48-mw-pakline-2-wind-farm/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://web.archive.org/web/20240125210009/https://www.cin.ba/energopotencijal/en/energopotencijal.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)