Baraiyarhat solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: 50 MW Grid-tied Solar Power Plant

Baraiyarhat solar farm is a solar photovoltaic (PV) farm in pre-construction in Chattogram district, Chattogram Division, Bangladesh.

Project Details

Table 1: Phase-level project details for Baraiyarhat solar farm

Status Nameplate capacity Technology Owner
Pre-construction[1] 50 MWp/dc[2] PV[2] Bangladesh Power Development Board [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Baraiyarhat solar farm

Location Coordinates (WGS 84)
Chattogram district, Chattogram Division, Bangladesh[2] 22.8926, 91.5339 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://web.archive.org/web/20240528181819/https://bpdb.portal.gov.bd/sites/default/files/files/bpdb.portal.gov.bd/page/771c9a89_a06c_4c2f_9b8c_699d17ed769a/2023-12-20-09-13-bc35a2ac1abda167c7c48437e4dc1061.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20220110172156/https://ndre.sreda.gov.bd/index.php?id=06&kid=4169. Archived from the original on 10 January 2022. {{cite web}}: Missing or empty |title= (help)