Baranoa PV Solar Park

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Baranoa PV Solar Park (Parque Solar Fotovoltaico Baranoa) is a solar photovoltaic (PV) farm under construction in Baranoa, Rio Meta, Atlantico, Colombia.

Project Details

Table 1: Phase-level project details for Baranoa PV Solar Park

Status Nameplate capacity Technology Owner Operator
Construction[1] 19.9 MWac[2] PV[3] China Three Gorges CORP (CTG) [100%] (中国长江三峡集团有限公司)[4] Fotovoltaica El Yarumo[5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Baranoa PV Solar Park

Location Coordinates (WGS 84)
Baranoa, Rio Meta, Atlantico, Colombia[2] 4.0999, -72.9088 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. "Inicia construcción del primer parque solar en Baranoa". ELHERALDO.CO. 2023-05-03. Archived from the original on 2024-08-22. Retrieved 2024-08-13.
  2. 2.0 2.1 2.2 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
  3. https://web.archive.org/web/20240207120805/https://www.power-technology.com/marketdata/power-plant-profile-atlantico-solar-i-baranoa-pv-park-colombia/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240206193109/https://www.atlantico.gov.co/index.php/noticias/gobernadora/21274-nuevo-proyecto-de-energia-solar-en-baranoa-potencia-rol-protagonico-del-atlantico-en-la-transicion-energetica-elsa-noguera. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125171503/https://www1.upme.gov.co/Normatividad/Anexo_articulo_50_R_CREG_075_2021_Circ_030.xlsx. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)