Bataan Solar Power Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Bataan Solar Power Project Phase 3b
Bataan Solar Power Project is an operating solar photovoltaic (PV) farm in Hermosa, Bataan Province, Philippines.
Project Details
Table 1: Phase-level project details for Bataan Solar Power Project
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2021[2] | 32 MW[1] | PV[3] | Provincial Government of Bataan; Global Green Growth Institute (GGGI)[3] | Jobin-SQM INC[1] |
2 | Operating[4] | 2021[5] | 22 MWp/dc[5] | PV[1] | Provincial Government of Bataan; Global Green Growth Institute (GGGI)[3] | – |
3a | Operating[6] | 2022[6] | 34 MWac[7] | PV[6] | Provincial Government of Bataan; Global Green Growth Institute (GGGI)[3] | – |
3b | Shelved (inferred August 2023) | – | 38 MWp/dc[1] | PV[1] | – | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bataan Solar Power Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Hermosa, Bataan Province, Philippines[1] | 14.8302, 120.5086 (approximate)[1] |
2 | Hermosa, Bataan Province, Philippines[1] | 14.7950, 120.3660 (exact)[5] |
3a | Hermosa, Bataan Province, Philippines[1] | 14.8302, 120.5086 (approximate)[1] |
3b | Hermosa, Bataan Province, Philippines[1] | 14.8302, 120.5086 (approximate)[1] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/private_sector_initiated_power_projects/luzon_committed_2021_june_01.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://gggi.org/gggi-bataan-collaboration-on-a-50-mw-solar-farm-explored/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_committed_2022_mar-31.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 "Wiki-Solar Database". https://wiki-solar.org/. April, 2023. Adapted with permission.
{{cite web}}
: Check date values in:|date=
(help); External link in
(help)CS1 maint: url-status (link)|website=
- ↑ 6.0 6.1 6.2 (PDF) https://web.archive.org/web/20221224051452/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_committed_2022_mar-31.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20210827171629/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf.
{{cite web}}
: Missing or empty|title=
(help)