Bataan Solar Power Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Bataan Solar Power Project Phase 3b

Bataan Solar Power Project is an operating solar photovoltaic (PV) farm in Hermosa, Bataan Province, Philippines.

Project Details

Table 1: Phase-level project details for Bataan Solar Power Project

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2021[2] 32 MW[1] PV[3] Provincial Government of Bataan; Global Green Growth Institute (GGGI)[3] Jobin-SQM INC[1]
2 Operating[4] 2021[5] 22 MWp/dc[5] PV[1] Provincial Government of Bataan; Global Green Growth Institute (GGGI)[3]
3a Operating[6] 2022[6] 34 MWac[7] PV[6] Provincial Government of Bataan; Global Green Growth Institute (GGGI)[3]
3b Shelved (inferred August 2023) 38 MWp/dc[1] PV[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Bataan Solar Power Project

Phase Name Location Coordinates (WGS 84)
1 Hermosa, Bataan Province, Philippines[1] 14.8302, 120.5086 (approximate)[1]
2 Hermosa, Bataan Province, Philippines[1] 14.7950, 120.3660 (exact)[5]
3a Hermosa, Bataan Province, Philippines[1] 14.8302, 120.5086 (approximate)[1]
3b Hermosa, Bataan Province, Philippines[1] 14.8302, 120.5086 (approximate)[1]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/private_sector_initiated_power_projects/luzon_committed_2021_june_01.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://gggi.org/gggi-bataan-collaboration-on-a-50-mw-solar-farm-explored/. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_committed_2022_mar-31.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 "Wiki-Solar Database". https://wiki-solar.org/. April, 2023. Adapted with permission. {{cite web}}: Check date values in: |date= (help); External link in |website= (help)CS1 maint: url-status (link)
  6. 6.0 6.1 6.2 (PDF) https://web.archive.org/web/20221224051452/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_committed_2022_mar-31.pdf. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://web.archive.org/web/20210827171629/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf. {{cite web}}: Missing or empty |title= (help)