Battle Born Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Battle Born Solar Project is a cancelled solar photovoltaic (PV) farm in Las Vegas, Mormon Mesa, Nevada, United States.

Project Details

Table 1: Phase-level project details for Battle Born Solar Project

Status Nameplate capacity Technology Owner
Cancelled[1] 850 MW[1] PV[1] Arevia Power [100%][2][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Battle Born Solar Project

Location Coordinates (WGS 84)
Las Vegas, Mormon Mesa, Nevada, United States[2] 36.5122, -114.376 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240201180947/https://pv-magazine-usa.com/2021/07/26/facing-opposition-developers-pull-application-for-850-mw-solar-project-in-the-nevada-desert/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240206194235/https://mvprogress.com/2021/07/28/our-mesa-saved-application-withdrawn-on-huge-battle-born-solar-project/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)