Baturaden geothermal power plant is a geothermal power plant in pre-construction in Central Java, Indonesia.

Project Details

Table 1: Unit-level project details for Baturaden geothermal power plant

Unit name Status Commissioning year Nameplate capacity Technology Owner
1 Construction[1] 50 MW[2] Unknown type PT Trinergy Mandiri International [11%]; PT Nirwana Suci Abadi [89%][1][1]
Future units Pre-construction[1] 2025 (planned)[2] 170 MW[2] Unknown type PT Trinergy Mandiri International [11%]; PT Nirwana Suci Abadi [89%][1][1]

Location

Table 2: Unit-level location details for Baturaden geothermal power plant

Unit name Location Coordinates (WGS 84)
1 Central Java, Indonesia -7.3001, 109.2168 (approximate)
Future units Central Java, Indonesia -7.3001, 109.2168 (approximate)

The map below shows the approximate locations of the geothermal power plant units:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://www.power-technology.com/marketdata/power-plant-profile-baturaden-geothermal-power-plant-indonesia/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20230129193341/https://www.pwc.com/id/en/publications/assets/eumpublications/utilities/power-guide-2018.pdf. Archived from the original (PDF) on 29 January 2023. {{cite web}}: Missing or empty |title= (help)