Bauer to Lycium Oil Pipeline

From Global Energy Monitor
Part of the
Global Oil Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Bauer to Lycium Oil Pipeline is an operating crude oil pipeline in Australia.[1][2]

Location

The pipeline runs from Bauer oil field to Lycium, Australia, in the country's South Cooper Basin.

Loading map...

Project details

  • Operator:
  • Owner: PEL 91[2]
  • Parent company: Beach Energy [60%]; Drillsearch Energy [40%][2]
  • Capacity: 10,000 barrels per day[2]
  • Length: 47 kilometers[2]
  • Diameter: 152 millimeters[2]
  • Status: Operating[2]
  • Start year: 2013[2]
  • Cost:
  • Financing:
  • Associated infrastructure:

Articles and resources

References

  1. "https://www.asx.com.au/asxpdf/20120712/pdf/427cggkk9tv609.pdf" (PDF). ASX. Retrieved 2022-06-10. {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Bauer to Lycium oil pipeline comes online". The Australian Pipeliner. Retrieved 2022-06-10.

Related GEM.wiki articles

External resources

External articles