Bauer to Lycium Oil Pipeline
From Global Energy Monitor
Part of the Global Oil Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Bauer to Lycium Oil Pipeline is an operating crude oil pipeline in Australia.[1][2]
Location
The pipeline runs from Bauer oil field to Lycium, Australia, in the country's South Cooper Basin.
Project details
- Operator:
- Owner: PEL 91[2]
- Parent company: Beach Energy [60%]; Drillsearch Energy [40%][2]
- Capacity: 10,000 barrels per day[2]
- Length: 47 kilometers[2]
- Diameter: 152 millimeters[2]
- Status: Operating[2]
- Start year: 2013[2]
- Cost:
- Financing:
- Associated infrastructure:
Articles and resources
References
- ↑ "https://www.asx.com.au/asxpdf/20120712/pdf/427cggkk9tv609.pdf" (PDF). ASX. Retrieved 2022-06-10.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|title=
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Bauer to Lycium oil pipeline comes online". The Australian Pipeliner. Retrieved 2022-06-10.