Bayi Zaozhuang power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Bayi Zaozhuang power station (枣矿集团八一热电水煤浆煤矸石发电项目) is an operating power station of at least 350-megawatts (MW) in Tianshan Road, Xuecheng District, Zaozhuang, Shandong, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Bayi Zaozhuang power station | Tianshan Road, Xuecheng District, Zaozhuang, Shandong, China | 34.828388, 117.27105 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 3, Unit 4: 34.828388, 117.27105
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 3 | operating | coal: waste coal | 350 | subcritical | 2018 |
Unit 4 | announced | coal: waste coal | 350 | subcritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 3 | Zaozhuang Bayi Coal Water Slurry Thermal Power Co Ltd [100%] | Zaozhuang Bayi Coal Water Slurry Thermal Power Co Ltd [100.0%] |
Unit 4 | Zaozhuang Bayi Coal Water Slurry Thermal Power Co Ltd [100%] | Zaozhuang Bayi Coal Water Slurry Thermal Power Co Ltd [100.0%] |
Background
Bayi Zaozhuang power station began as a 2 x 24 MW coal plant in High Tech Development District, Zaozhuang Prefecture.[1]
Expansion
In 2014 Zaozhuang Bayi Cogen Power Co. proposed adding two coal-fired units of 350 MW subcritical units each.[2]
Unit 3 was approved for construction in January 2015,[3] and commissioned in February 2018.[4][5]
With no developments since 2014, unit 4 appears to be cancelled.
Articles and Resources
References
- ↑ "枣庄八一水煤浆热电有限责任公司," 山东省枣庄市薛城区泰山北路, accessed July 2019
- ↑ "关于枣庄八一热电公司煤矸石综合利用热电工程环境影响报告书的批复," China MEP, 2014年05月19日
- ↑ "八一水煤浆热电公司煤矸石综合利用热电机组项目获核准," 2015-01-14
- ↑ "| 枣庄八一热电公司350MW超临界CFB锅炉顺利投产 快讯," 2018-02-12
- ↑ "八一热电二期350MW超临界循环流化床机组正式并网发电商业运行," 山东能源枣矿集团, 2018/2/13