Bayram hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Bayram hydroelectric plant is an announced hydroelectric power plant in Şavşat, Black Sea, Artvin, Türkiye.

Project Details

Table 1: Project details for Bayram hydroelectric plant

Status Nameplate capacity Technology type Owner
Announced[1][2] 81 MW[3] Run-of-river[4] Energo-Pro [100%][1]

Location

Table 2: Location details for Bayram hydroelectric plant

Location River Coordinates (WGS 84)
Şavşat, Şavşat, Black Sea, Artvin, Türkiye[5][3][4][6] Çoruh River[3] 41.2618, 42.2998 (approximate)[5][3][4][6]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20220123141946/http://www.energo-pro.com.tr/en/sayfalar/turkiye-de-energo-pro.html. Archived from the original on 2022-01-23. {{cite web}}: Missing or empty |title= (help)
  2. https://enerji.dsi.gov.tr/Sayfa/Detay/774. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20220618163536/https://unece.org/fileadmin/DAM/env/water/meetings/Assessment/Tbilisi%20workshop/Presentations/Basin%20presentation%20pdfs/presentation_Tbilisi_Dec2009_Sezer_TR_Chorokhi-Coruh.pdf. Archived from the original (PDF) on 2022-06-18. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 (PDF) https://openjicareport.jica.go.jp/pdf/11627866.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://www.suyapi.com.tr/upload/Node/20848/xfiles/03A-Dam_HEPP.pdf. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://mapcarta.com/13825578. {{cite web}}: Missing or empty |title= (help)