Beauchastel hydroelectric plant is an operating hydroelectric power plant in Ardèche, Auvergne-Rhône-Alpes, France.

Project Details

Table 1: Project details for Beauchastel hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner
Operating[1] 1963[2] 192 MW[1] 6[2] Run-of-river[1] Compagnie Nationale du Rhône (CNR)[2]

Location

Table 2: Location details for Beauchastel hydroelectric plant

Location Coordinates (WGS 84)
Ardèche, Auvergne-Rhône-Alpes, France[2] 44.8242, 4.8099 (exact)[2]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "ENTSO-E Transparency Platform, Installed Capacity Per Production Unit". European Network of Transmission System Operators for Electricity. 2022. Retrieved April 1, 2022.
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20230219210838/https://www.cnr.tm.fr/energies-renouvelables/carte-des-actifs/. Archived from the original on 19 February 2023. {{cite web}}: Missing or empty |title= (help)