Bedburg (RWE) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Bedburg A 44n (Phase 2), Königshovener Höhe wind farm (Phase 1)

Bedburg (RWE) wind farm is an operating wind farm in Bedburg, Rhein-Erft-Kreis, North Rhine-Westphalia, Germany.

Project Details

Table 1: Phase-level project details for Bedburg (RWE) wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2015[2] 67 MW[1] Onshore[3] RWE AG [51%]; Community Owner - City of Bedburg [49%][1][4][1][4] RWE[5]
2 Operating[6] 2022[6] 29 MW[7] Onshore[8] RWE AG [51%]; Community Owner - City of Bedburg [49%][1][4][1][4]

Location

Table 2: Phase-level location details for Bedburg (RWE) wind farm

Phase Name Location Coordinates (WGS 84)
1 Bedburg, Rhein-Erft-Kreis, North Rhine-Westphalia, Germany[3] 51.0404, 6.5262 (exact)[3]
2 Bedburg, North Rhine-Westphalia, Germany[5] 51.0391, 6.5075 (exact)[5]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240126002739/https://www.rwe-production-data.com/en/consent/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240126163836/https://www.bedburg.de/Unsere-Stadt/Aktuelles-aus-Bedburg.htm/Aktuelles/Stadt-Bedburg-und-RWE-errichten-weiteren-Windpark.html. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://goo.gl/maps/FejpeHQ1uftjZqGp6. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240131130612/https://www.rwe.com/en/research-and-development/project-plans/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20240125152640/https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20240126135526/https://renews.biz/81333/rwe-connects-285mw-bedburg-a-44n-wind-farm/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240126002742/https://www.rwe.com/en/press/rwe-renewables/2021-01-08-bedburg-a-44n-next-wind-farm-on-former-opencast-mining-site/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240126102614/https://renewablesnow.com/news/rwe-to-build-285-mw-wind-farm-at-old-opencast-german-mine-727507/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)