Beijing Jingneng Guangdong Dongyuan Gas power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Beijing Jingneng Guangdong Dongyuan Gas power station (广东京能东源热电联产, 河源市东源县天然气热电联产项目) is a power station in pre-construction in Heyuan, Dongyuan County, Guangdong, China. It is also known as 东源县燃气热电联产项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Beijing Jingneng Guangdong Dongyuan Gas power station Heyuan, Dongyuan County, Guangdong, China 23.83268, 114.774929 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Pre-construction[2] fossil gas: natural gas[3][4][1][2] 400[1] combined cycle[1] yes[1] 2025 (planned)[2]
1-2 Pre-construction[2] fossil gas: natural gas[3][4][1][2] 400[1] combined cycle[1] yes[1] 2025 (planned)[2]
2-1 Pre-construction[2] fossil gas: natural gas[4][1][2] 400[1] combined cycle[1] yes[1]
2-2 Pre-construction[2] fossil gas: natural gas[4][1][2] 400[1] combined cycle[1] yes[1]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][1] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]
1-2 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][1] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]
2-1 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][1] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]
2-2 Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][1] Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%]

Background

Unit 1 and Unit 2 are scheduled to commence construction in March 2024 and achieve production by the end of 2025.[5]

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 https://www.beipa.org.cn/newsinfo/4477265.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 https://www.sohu.com/a/716174422_121123763. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240508050014/https://new.qq.com/rain/a/20240125A03C6P00. Archived from the original on 08 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 http://www.gddongyuan.gov.cn/hdjl/fkyj/content/post_565344.html. {{cite web}}: Missing or empty |title= (help)
  5. "总投资超30亿,明年3年动工!广东京能东源2×400MW(9F改进型)热电联产工程选址东源县仙塘镇热水村". 2023-08-30. Retrieved 2023-10-18.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.