Beijing Jingneng Guangdong Dongyuan Gas power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Beijing Jingneng Guangdong Dongyuan Gas power station (东源县燃气热电联产项目河源市东源县天然气热电联产项目, 广东京能东源热电联产, 京能4×400MW级燃气热电联产项目, 河源市东源县天然气热电联产项目) is a power station in pre-construction in Xiantang Town, Reshui Village, Heyuan County, Guangdong, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Beijing Jingneng Guangdong Dongyuan Gas power station | Xiantang Town, Reshui Village, Heyuan County, Guangdong, China | 23.837652, 114.770794 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1-1 | Pre-construction[2] | fossil gas: natural gas[3][4][5][1] | 400[5] | combined cycle[5] | yes[5] | 2025 (planned)[1] |
1-2 | Pre-construction[2] | fossil gas: natural gas[3][4][5][1] | 400[5] | combined cycle[5] | yes[5] | 2025 (planned)[1] |
2-1 | Pre-construction[2] | fossil gas: natural gas[4][5][1] | 400[5] | combined cycle[5] | yes[5] | – |
2-2 | Pre-construction[2] | fossil gas: natural gas[4][5][1] | 400[5] | combined cycle[5] | yes[5] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1-1 | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][5] | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%] |
1-2 | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][5] | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%] |
2-1 | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][5] | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%] |
2-2 | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100%][5] | Beijing Energy Clean Energy and Power Shareholding Huanan Branch Co Ltd [100.0%] |
Background
Unit 1 and Unit 2 are scheduled to commence construction in March 2024 and achieve production by the end of 2025.[6]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.sohu.com/a/716174422_121123763.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://static.nfnews.com/content/202405/21/c8893341.html?enterColumnId=2556.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "2024年省重点建设项目,涉及河源的有这些_腾讯新闻". new.qq.com. 2024-01-25. Archived from the original on 2024-05-08. Retrieved 2024-04-26.
- ↑ 4.0 4.1 4.2 4.3 http://www.gddongyuan.gov.cn/hdjl/fkyj/content/post_565344.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 https://www.beipa.org.cn/newsinfo/4477265.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "总投资超30亿,明年3年动工!广东京能东源2×400MW(9F改进型)热电联产工程选址东源县仙塘镇热水村". 2023-08-30. Retrieved 2023-10-18.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.