Beinn An Tuirc wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Amazon Wind Farm Scotland - Beinn an Tuirc 3 (Phase 3), Amazon Kintyre wind farm (Phase 3)
Beinn An Tuirc wind farm is an operating wind farm in Argyll and Bute, Scotland, United Kingdom.
Project Details
Table 1: Phase-level project details for Beinn An Tuirc wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2001[1] | 30 MW[1] | Onshore[1] | – | Scottish Power; Commission de Régulation de L'énergie (CRE)[1][1] |
2 | Operating[1] | 2014[1] | 43.7 MW[1] | Onshore[1] | ScottishPower Renewables [100%][1] | ScottishPower Renewables[1] |
3 | Construction[1] | – | 49.9 MW[1] | Onshore[1] | ScottishPower Renewables [100%][2][3] | – |
Location
Table 2: Phase-level location details for Beinn An Tuirc wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Argyll and Bute, Scotland, United Kingdom[1] | 55.5732, -5.5874 (exact)[1] |
2 | Argyll and Bute, Scotland, United Kingdom[1] | 55.5732, -5.5874 (exact)[1] |
3 | Argyll and Bute, Scotland, United Kingdom[1] | 55.5457, -5.6115 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 https://web.archive.org/web/20240327051815/https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract. Archived from the original on 27 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.scottishpower.com/userfiles/file/SPL%202021%20Accounts.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.power-technology.com/data-insights/power-plant-profile-beinn-an-tuirc-phase-3-uk/.
{{cite web}}
: Missing or empty|title=
(help)