Bellora-Naigaon Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Bellora-Naigaon Coal Mine is an operating coal mine in Wani area, Yavatmal, Maharashtra, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Bellora-Naigaon Coal Mine | Wani area, Yavatmal, Maharashtra, India | 19.976764, 79.088501 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | 1993 | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
1.25[1] | 0.941952[1] | 2022[1] | Surface | Open Pit | – | 120[2] | #REF!* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
– | – | – | Wardha Valley | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Western Coalfields Ltd[3] | Coal India | India |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | 0.15[2] | – | – | – | 0.94[1] | – | – |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.
Background on Mine
The Bellora-Naigaon coal mine is owned by Western Coalfields Limited, a subsidiary of Coal India Limited. This project is an expansion of the already operating project Naigaon OC Expansion project on 398.66 ha, Environment Clearance (EC) for which was granted on 2 February 2009. The new proposal is to expand the area from 398.66 ha to 626.17 ha and a depth of 170 mts. to achieve the peak capacity of 1.25 MTPA. The EC for the expansion was granted on 6 March, 2012.[4]
The mine produce no coal in 2020.
Expansion Details
- Status: Operating
- Size of Expansion: 1.25 MTPA
- Permits and Applications: Environmental Clearance for expansion in production capacity upto 1.25 MTPA, MoEF&CC India, 6 March, 2012
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 (PDF) https://web.archive.org/web/20240125232230/http://www.westerncoal.in/images/env_statement_2021-22.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) http://www.westerncoal.in/images/env_belnaioc1.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240723001427/http://www.westerncoal.in/images/grade_2021_22.pdf. Archived from the original (PDF) on 23 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Environmental Clearance for expansion in production capacity upto 1.25 MTPA, MoEF&CC India, 6 March, 2012