Berezovskaya (Belarus) power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Berezovskaya (Belarus) power station (Березовская ГРЭС, пиково-резервный энергоисточник (ПРЭИ)) is an operating power station of at least 1095-megawatts (MW) in Beloozersk, Brest, Belarus with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Berezovskaya (Belarus) power station | Beloozersk, Brest, Belarus | 52.453863, 25.193031 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- CC3, CC4, CC5, CC7, GT1, GT2, GT3, GT4, GT5: 52.453863, 25.193031
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
CC3 | Operating[2] | fossil gas: natural gas, fossil liquids: fuel oil[2] | 215[2] | combined cycle[2] | yes[2] | 2005[3] | 2025 (planned)[4][5][6] |
CC4 | Operating[2] | fossil gas: natural gas, fossil liquids: fuel oil[2] | 215[2] | combined cycle[2] | yes[2] | 2003[3] | 2025 (planned)[4][5][6] |
CC5 | Operating[2] | fossil gas: natural gas, fossil liquids: fuel oil[2] | 238[2] | combined cycle[2] | yes[2] | 2008[3] | – |
CC7 | Operating[2] | fossil gas: natural gas, fossil liquids: fuel oil[2] | 427[2] | combined cycle[2] | yes[2] | 2014[3] | – |
GT1 | Construction[7][8][9][10][11][12][13][14][15][6][16] | fossil gas: natural gas[16] | 57[17][18][19] | gas turbine[20] | yes[13][21][19] | 2024 (planned)[11][15][6][22][23] | – |
GT2 | Construction[7][8][9][10][11][12][13][14][15][6][16] | fossil gas: natural gas[16] | 57[17][18][19] | gas turbine[20] | yes[13][21][19] | 2024 (planned)[11][15][6][22][23] | – |
GT3 | Construction[7][8][9][10][11][12][13][14][15][6][16] | fossil gas: natural gas[16] | 57[17][18][19] | gas turbine[20] | yes[13][21][19] | 2024 (planned)[11][15][6][22][23] | – |
GT4 | Construction[7][8][9][10][11][12][13][14][15][6][16] | fossil gas: natural gas[16] | 57[17][18][19] | gas turbine[20] | yes[13][21][19] | 2024 (planned)[11][15][6][22][23] | – |
GT5 | Construction[7][8][9][10][11][12][13][14][15][6][16] | fossil gas: natural gas[16] | 57[17][18][19] | gas turbine[20] | yes[13][21][19] | 2024 (planned)[11][15][6][22][23] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
CC3 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
CC4 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
CC5 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
CC7 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
GT1 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
GT2 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
GT3 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
GT4 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
GT5 | Brestenergo RUE [100%][24][2][16] | BelEnergo State Production Association of Power Industry [100.0%] |
Project-level captive use details
Background
In October 2021, construction of units 1-5 was already underway.[26] The turbines were delivered on-site and installed. Construction of associated infrastructure was underway. The project was expected to be completed in two phases: Phase I would include the commissioning of units GT3 and GT4, and Phase II of the remaining units GT1, GT2, and GT 5. The project was expected to be commissioned by 2022.[26] Construction was ongoing in April 2022.[27]Siemens supplies the gas turbines for the construction of units GT1-GT5.[26] After the start of the war, Siemens put all new business and international deliveries to Russia and Belarus on hold.[28] As of October 2022, the consequences for the delivery, operations, and maintenance of existing and planned Siemens gas turbines is unclear.[29]Units CC3 and CC4 are to retire in 2025, following the commissioning of the Astravets nuclear power plant.[30]As of October 2022, the completion of construction works on units GT1-5 was postponed from 2022 to 2023.[31]
In August 2023, it was reported that SCADA software designed for automation of operational-dispatch and operational-technical control of the power station had been installed at the plant.[32] As of December 2023, there have not been any further updates.
In March 2024, it was reported that the construction was in its final stage and the new units were expected to be commissioned within 1-1.5 months.[33][34] Since the start of the project implementation, the total investment amount has exceeded RUB 450 million. Once built, the new units will be providing capacity reserve for the country's first nuclear power plant in case of outages.[35] As of May 2024, there have not been any further updates.
Articles and Resources
References
- ↑ https://www.google.com/maps/place/Berezovskaya+Gres,+Belarus/@52.4659373,25.138987,10234m/data=!3m1!1e3!4m5!3m4!1s0x47274a34f8948e2b:0xd0f0674adb405a5f!8m2!3d52.4525834!4d25.193367.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 https://web.archive.org/web/20221129184802/https://www.brestenergo.by/%D0%91%D0%B5%D1%80%D0%B5%D0%B7%D0%BE%D0%B2%D1%81%D0%BA%D0%B0%D1%8F_%D0%93%D0%A0%D0%AD%D0%A1. Archived from the original on 29 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20220709030313/https://brestobl.com/predpr/05bereza/gres_5.html. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20220530093909/https://ru.wikipedia.org/wiki/%D0%91%D0%B5%D1%80%D1%91%D0%B7%D0%BE%D0%B2%D1%81%D0%BA%D0%B0%D1%8F_%D0%93%D0%A0%D0%AD%D0%A1_(%D0%91%D0%B5%D0%BB%D0%BE%D1%80%D1%83%D1%81%D1%81%D0%B8%D1%8F). Archived from the original on 30 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://energodoc.by/js/pdfjs/web/viewer.html?file=/file/fulltext-view/8720.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 (PDF) https://web.archive.org/web/20220911200244/https://www.minenergo.gov.by/wp-content/uploads/2021/%D0%9F%D0%9A%D0%9C%D0%AD%202025-%D1%81.pdf. Archived from the original (PDF) on 11 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 https://web.archive.org/web/20220709034942/https://xn--80aaigboe2bzaiqsf7i.xn--p1ai/ENERGAZ-izgotovil-i-ispital-gazopriemnuyu-stantsiyu-dlya-pikovoy-GTES-Berezovskoy-GRES/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 https://web.archive.org/web/20220130030823/https://www.interfax.ru/world/768861. Archived from the original on 30 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 https://web.archive.org/web/20220709023255/https://1reg.by/2021/04/29/modernizaciya-berezovskoy-gres-mozhet-byit-sorvana/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 https://web.archive.org/web/20211022181719/https://telegraf.by/politika/sami-kreditujut-vlasti-belarusi-nesmotrya-ni-na-chto-siemens-prodolzhaet-postavlyat-turbiny-na-belaes/. Archived from the original on 22 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 https://belnipi.by/2021/10/28/stroitelstvo-pikovo-rezervnogo-istochnika-na-berezovskoj-grjes/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 https://energybase.ru/news/companies/pikovo-rezervnyj-energoistocnik-na-berezovskoj-gres-osnasen-gazopriemnoj-stancie-2022-04-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 https://web.archive.org/web/20221227172952/https://www.belta.by/regions/view/zapadnyj-forpost-belorusskoj-energosistemy-novye-zadachi-i-perspektivy-berezovskoj-gres-542099-2022/. Archived from the original on 27 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 https://web.archive.org/web/20240116201153/https://intechs.by/implementation/3. Archived from the original on 16 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 15.4 15.5 15.6 15.7 15.8 15.9 https://web.archive.org/web/20240404224318/https://www.sb.by/articles/energiya-sozidaniya-berezovskaya-gres.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.00 16.01 16.02 16.03 16.04 16.05 16.06 16.07 16.08 16.09 16.10 16.11 16.12 16.13 16.14 16.15 16.16 16.17 16.18 https://web.archive.org/web/20211028012507/https://www.ekn.se/en/what-we-do/sustainability/transactions-with-environmental-and-social-impact-assessment/archive/new-250-mw-peakbackup-facility-at-existing-gas-power-plant-belarus/. Archived from the original on 28 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 https://web.archive.org/web/20210420233706/http://en.energas.ru/pressroom/news/rezervnaya-gazoturbinnaya-elektrostantsiya-sozdaetsya-na-novopolotskoy-tets-v-belarusi/. Archived from the original on 20 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 (PDF) https://web.archive.org/web/20220911200244/https://minenergo.gov.by/wp-content/uploads/2021/%D0%9F%D0%9A%D0%9C%D0%AD%202025-%D1%81.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 19.5 19.6 19.7 19.8 19.9 https://web.archive.org/web/20211028012507/https://www.ekn.se/en/what-we-do/sustainability/transactions-with-environmental-and-social-impact-assessment/archive/new-250-mw-peakbackup-facility-at-existing-gas-power-plant-belarus/.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 20.4 https://web.archive.org/web/20210420212619/https://www.nsenergybusiness.com/news/siemens-gas-turbines-254mw/. Archived from the original on 20 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 21.3 21.4 https://www.power-technology.com/marketdata/power-plant-profile-berezovskaya-gas-power-plant-belarus/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 22.0 22.1 22.2 22.3 22.4 https://web.archive.org/web/20210420214002/https://www.gastopowerjournal.com/itemlist/tag/Belarus. Archived from the original on 20 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 23.2 23.3 23.4 https://web.archive.org/web/20221217104532/https://news.zerkalo.io/economics/24537.html. Archived from the original on 17 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 24.0 24.1 24.2 24.3 24.4 24.5 24.6 24.7 24.8 https://web.archive.org/web/20220629060440/https://neftegaz.ru/news/energy/732532-pikovo-rezervnyy-energoistochnik-na-berezovskoy-gres-osnashchen-gazopriemnoy-stantsiey-energaz/. Archived from the original on 29 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 25.0 25.1 https://web.archive.org/web/20220930023722/https://vb.by/econom/goseconimic/vremya-bolshogo-pritoka-energeticheskij-gigant-brestchiny-berezovskaya-gres-pered-novym-godom-otmechaet-svoe-60-letie.html. Archived from the original on 30 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 26.0 26.1 26.2 "Строительство пиково-резервного источника на Березовской ГРЭС — Белнипиэнергопром". Retrieved July 13, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Пиково-резервный энергоисточник на Березовской ГРЭС оснащен газоприемной станцией «ЭНЕРГАЗ»". Retrieved July 13, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Siemens to wind down Russian business | Press | Company | Siemens". press.siemens.com. Retrieved 2022-10-26.
- ↑ "Приостановка сотрудничества с Siemens с Беларусью: последствия" (in русский). Retrieved 2022-10-26.
- ↑ (PDF) https://energodoc.by/js/pdfjs/web/viewer.html?file=/file/fulltext-view/8720.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221217104532/https://news.zerkalo.io/economics/24537.html.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ "БЕРЕЗОВСКАЯ ГРЭС РУП "БРЕСТЭНЕРГО"". InnoTech Solutions. August 11, 2023. Retrieved December 11, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Березовская ГРЭС: идей и планов у нас много, главное — не понижать планку". https://www.sb.by. March 29, 2024. Retrieved April 12, 2024.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|website=
- ↑ "В БЕЛАРУСИ БУДУТ РАСШИРЕНЫ РАБОТЫ ПО МОДЕРНИЗАЦИИ ЭЛЕКТРОСЕТЕЙ". rupbes.by. February 23, 2024. Retrieved May 28, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "РОСТ В ЭКСПОРТЕ, ПРОМЫШЛЕННОСТИ И СЕЛЬСКОМ ХОЗЯЙСТВЕ: ВЯЧЕСЛАВ МЕТЛИЦКИЙ РАССКАЗАЛ ОБ ИТОГАХ 2023 ГОДА И ПЛАНАХ НА 2024-Й В БЕРЕЗОВСКОМ РАЙОНЕ". bereza.by. April 6, 2024. Retrieved April 12, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.