Berneau–Eynatten Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Berneau–Eynatten Gas Pipeline is an operating gas pipeline in Belgium.[1]
Location
The pipeline starts in Berneau, Belgium, and runs to Eynatten, Belgium.[2]
Project Details
- Operator: Fluxys[3]
- Owner: Fluxys[3]
- Parent company: Fluxys[3]
- Capacity:
- Length: 25.5 km / 15.8 mi[4]
- Diameter:
- Status: Operating[1]
- Start Year:
- Corresponding SciGrid name(s): Berneau_Eynatten[1]
Resources and articles
References
- ↑ 1.0 1.1 1.2 Diettrich, J.C.; Pluta, A.; Medrjoubi, W. (July 23, 2020). "The combined IGG gas transmission network data set". SciGRID_gas. Retrieved September 2, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ European Network of Transmission System Operators for Gas (October 2020). "TYNDP 2020 - MAP – Transmission" (PDF). ENTSOG. Retrieved December 4, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 Vasquez, Juan. "Gas Transport in Belgium – Daily Balancing with Hourly Constraints: Impact on Metering" (PDF). Retrieved Jul 26th, 2022.
{{cite web}}
: Check date values in:|access-date=
(help); line feed character in|title=
at position 27 (help)CS1 maint: url-status (link) - ↑ TYNDP 2020 - MAP – Transmission, ENTSOG, October 2020; length calculated by Global Energy Monitor