Betan Karnali hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Betan Karnali hydroelectric plant is a hydroelectric power plant in pre-construction in Birendranagar City, Surkhet District, Bheri Zone, Karnali Province, Nepal.
Project Details
Table 1: Project details for Betan Karnali hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2028 (planned)[1] | 439 MW[1] | Conventional and run-of-river[2] | Karmachari Sanchaya Kosh (KSK) [55%]; Nepal Electricity Authority (NEA) [10%]; Vidhyut Utpadan CO LTD (VUCL) [10%][3] | Betan Karnali Sanchaya Karta Hydropower CO LTD (BKSHCL)[3] |
Location
Table 2: Location details for Betan Karnali hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Birendranagar City, Surkhet District, Bheri Zone, Karnali Province, Nepal[4] | Karnali River[5] | 29.3081, 82.4721 (approximate)[4] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20221110144607/https://myrepublica.nagariknetwork.com/news/construction-of-439-mw-betan-karnali-semi-reservoir-project-to-start-from-2023-end/. Archived from the original on 10 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220812045516/https://www.power-technology.com/marketdata/betan-karnali-nepal/. Archived from the original on 12 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20201128125941/https://bkshcl.com.np/pages/about-us?lan=en. Archived from the original on 28 November 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20220927103949/http://www.nepalenergyforum.com/betan-karnali-dpr-to-be-completed-by-august/. Archived from the original on 27 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220629072913/https://www.newbusinessage.com/MagazineArticles/view/2856. Archived from the original on 29 June 2022.
{{cite web}}
: Missing or empty|title=
(help)