Bezhanitsy-Novorzhev Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Bezhanitsy-Novorzhev Gas Pipeline (Russian: Газопровод-отвод Бежаницы - ГPC «Новоржев» Псковской области) is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to connect to an existing pipeline near Bezhanitsy, Pskov Oblast and run to Novorzhev, Pskov Oblast, Russia.
Project details
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.071 bcm/year[2]
- Length: 36 km[3]
- Diameter:
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Novorzhev-Pushkinskiye Gory Gas Pipeline; Pushkinskiye Gory-Opochka Gas Pipeline
Background
The pipeline was included in the gasification program of Gazprom for 2021-2025 for Pskov Oblast.[1]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "Программа газификации 2021–2025 в Псковской области". Gazprommap.ru. 2022. Retrieved Jul 28, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Распоряжение Правительства Российской Федерации от 06.05.2015 г. № 816-р". government.ru (in русский). Retrieved 2022-08-09.
- ↑ EnergyLand. "«Газпром газораспределение Псков» проложит газопровод до Новоржева". www.energyland.info. Retrieved 2022-08-09.