Bheri 2 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Bheri 2 hydroelectric plant is a shelved hydroelectric power plant in Ghetma Village, Rukum District, Rapti Zone, Lumbini Province, Nepal.
Project Details
Table 1: Project details for Bheri 2 hydroelectric plant
Status | Nameplate capacity | Owner | Operator |
---|---|---|---|
Shelved[1] | 256 MW[2] | Gezhouba Group Power Investment Nepal; KSK Energy Ventures[3] | Bheri Hydro Power[3] |
Location
Table 2: Location details for Bheri 2 hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Ghetma Village, Rukum District, Rapti Zone, Lumbini Province, Nepal[2] | Bheri River[2] | 28.7792, 82.3125 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20230327064937/https://english.onlinekhabar.com/nepal-hydropower-hostage-foreigners.html. Archived from the original on 27 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20221022144518/http://www.doed.gov.np/license/13. Archived from the original on 22 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.power-technology.com/marketdata/bheri-2-nepal/.
{{cite web}}
: Missing or empty|title=
(help)