Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI) was a proposed gas pipeline in Austria and Czechia.[1][2]
Location
The pipeline will run between Baumgarten, Austria; Reinthal, Austria; and Břeclav, Czech Republic.[3][4]
Pipeline Details
- Operator: Gas Connect Austria GmbH / NET4GAS, s.r.o.
- Owner: Gas Connect Austria GmbH / NET4GAS, s.r.o.
- Parent: Verbund, Snam, Allianz, OMV Group, Mubadala Investments
- Proposed Capacity: 635.66 million cubic feet per day[5]
- Length: 62 km
- Diameter: 31.5 inches
- Financing: €41,993 grant from the EU's Connecting Europe Facility[5]
- Status: Proposed[6]
- Start Year: 2026
Background
In July 2020, Net4Gas' 2021-2030 investment plan set out the company's intention to postpone and scale back gas interconnection projects with Poland and Austria as these projects were not included in the European list of projects of common interest (PCI). The BACI project that was expected in 2024 was "halted" but may be replaced by a smaller project due to be ready in 2026.[6][7]
Net4Gas told Reuters "the current 10-year plan does not expect the BACI and STORK II projects in their earlier planned form," and that the plan did not include the alternative possibilities.[6]
In 2014, the project was awarded a €41,993 grant from the Connecting Europe Facility for preparatory studies.[5]
European Network of Transmission System Operators for Gas (ENTSOG) listed this project as TRA-A-133 in their 2020 iteration of the proposed project details for the EU.[1] The publication notes that the project has "reacted" to the capacity market study completed by NET4GAS and Gas Connect Austria in 2019, and features a new identification number of TRA-N-60.[8]
Articles and resources
References
- ↑ 1.0 1.1 ENTSOG TYNDP 2020 - Annex A - Projects Tables, ENTSOG, accessed January 2020.
- ↑ Bidirectional Austrian-Czech Interconnector (BACI), Gas Connect Austria, accessed Jan. 15, 2020.
- ↑ [https://www.net4gas.cz/files/en/projects/n4g_pci_info_leaflet_baci_en.pdf PCI 6.4 Bidirectional Austrian-Czech Interconnection (BACI) between Baumgarten (AT) – Reintal (CZ/AT) – Břeclav (CZ)], NET4GAS, accessed Jan. 15, 2020.
- ↑ INNOVATION AND NETWORKS EXECUTIVE AGENCY (December 2020). "Preparatory studies for the first bidirectional AT-CZ interconnection ('BACI')". europa.eu. Retrieved December 9, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 5.2 Preparatory studies for the first bidirectional AT-CZ interconnection ("BACI"), European Commission, January 2015
- ↑ 6.0 6.1 6.2 Staff, Reuters (2020-07-16). "Net4Gas scales back Poland, Austria interconnector plans". Reuters. Retrieved 2020-09-23.
{{cite news}}
:|first=
has generic name (help) - ↑ "Czech TSO suspends gas interconnection projects with Poland and Austria", EnerData, Jul. 20, 2020.
- ↑ "TYNDP | ENTSOG". www.entsog.eu. Retrieved 2022-06-29.