Binongan Tineg hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Binongan Tineg hydroelectric plant is a cancelled hydroelectric power plant in Lagayan, Abra, Cordillera, Luzon, Philippines.
Project Details
Table 1: Project details for Binongan Tineg hydroelectric plant
Status | Nameplate capacity | Technology type | Owner |
---|---|---|---|
Cancelled[1] | 175 MW[2] | Conventional storage[3] | First Gen[2] |
Location
Table 2: Location details for Binongan Tineg hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Lagayan, Abra, Cordillera, Luzon, Philippines[4][5][2] | 17.7958, 120.7858 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 4 years, no published updates
- ↑ 2.0 2.1 2.2 2.3 (PDF) https://web.archive.org/web/20180617115705/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_hydropower_2017-06-30.pdf. Archived from the original (PDF) on 17 June 2018.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.power-technology.com/marketdata/binongan-philippines/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://mapcarta.com/15810438.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://mapcarta.com/15761932.
{{cite web}}
: Missing or empty|title=
(help)