Binongan Tineg hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Binongan Tineg hydroelectric plant is a cancelled hydroelectric power plant in Lagayan, Abra, Cordillera, Luzon, Philippines.

Project Details

Table 1: Project details for Binongan Tineg hydroelectric plant

Status Nameplate capacity Technology type Owner
Cancelled[1] 175 MW[2] Conventional storage[3] First Gen[2]

Location

Table 2: Location details for Binongan Tineg hydroelectric plant

Location Coordinates (WGS 84)
Lagayan, Abra, Cordillera, Luzon, Philippines[4][5][2] 17.7958, 120.7858 (approximate)[2]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 4 years, no published updates
  2. 2.0 2.1 2.2 2.3 (PDF) https://web.archive.org/web/20180617115705/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_hydropower_2017-06-30.pdf. Archived from the original (PDF) on 17 June 2018. {{cite web}}: Missing or empty |title= (help)
  3. https://www.power-technology.com/marketdata/binongan-philippines/. {{cite web}}: Missing or empty |title= (help)
  4. https://mapcarta.com/15810438. {{cite web}}: Missing or empty |title= (help)
  5. https://mapcarta.com/15761932. {{cite web}}: Missing or empty |title= (help)