Bir Rebaa Nord–Menzel Ledjmet Est Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Bir Rebaa Nord–Menzel Ledjmet Est Gas Pipeline is an existing natural gas pipeline, running from Bir Rebaa Nord gas field to Menzel Ledjmet Est gas field, Algeria.
Location
The pipeline runs from Bir Rebaa Nord gas field, Ouargla province, to Menzel Ledjmet Est gas field, Illizi province, Algeria.
Background
The Bir Rebaa Nord–Menzel Ledjmet Est Gas Pipeline is a 185-km, 16-inch gas pipeline connecting two gas fields. The pipeline is owned by Sonatrach, and was built by Algerian firms. It was built on an accelerated schedule in collaboration with Eni, which will be using the pipeline. It was completed in March 2020.[1][2]
Project Details
- Operator: Sonatrach
- Current capacity: 2.5 billion cubic meters per year
- Length: 185 kilometers
- Status: Operating
- Start Date: Mar. 2020
Articles and resources
References
- ↑ Eni, Sonatrach finish gas pipeline in Algeria’s Berkine basin, Kallanish Energy, 3 Mar. 2020.
- ↑ Eni and SONATRACH successfully complete the gas pipeline connecting the BRN and MLE fields in Algeria with a fast track project, Europétrole, 3 Mar. 2020.