Black Mesa Pumped Storage East hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Black Messa Pumped Storage East
Black Mesa Pumped Storage East hydroelectric plant is a cancelled hydroelectric power plant in Navajo County, Arizona, United States.
Project Details
Table 1: Project details for Black Mesa Pumped Storage East hydroelectric plant
Status | Nameplate capacity | Technology type |
---|---|---|
Cancelled[1] | 1500 MW[2] | Pumped storage[2] |
Location
Table 2: Location details for Black Mesa Pumped Storage East hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Navajo County, Arizona, United States[2] | 36.678, -110.288 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://biologicaldiversity.org/w/news/press-releases/federal-officials-reject-three-huge-arizona-pump-storage-projects-targeting-black-mesa-2024-02-15/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20221109193334/https://hydrosource.ornl.gov/sites/default/files/2022-04/ORNL_US_Hydropower_DevelopmentPipeline_Data_FY2022.xlsx. Archived from the original on 2022-11-09.
{{cite web}}
: Missing or empty|title=
(help)