Blaiken wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Blaiken wind farm is an operating wind farm in Västerbotten County, Sweden.
Project Details
Table 1: Phase-level project details for Blaiken wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2013[1] | 75 MW[1] | Onshore[1] | Skellefteå Kraft AB [85%]; Fortum Oyj [15%][2][2] | BlaikenVind AB[1] |
2 | Operating[1] | 2014[1] | 75 MW[1] | Onshore[1] | Skellefteå Kraft AB [85%]; Fortum Oyj [15%][2][2] | BlaikenVind AB[1] |
3 | Operating[1] | 2017[1] | 98 MW[1] | Onshore[1] | Skellefteå Kraft AB [85%]; Fortum Oyj [15%][2][2] | BlaikenVind AB[1] |
Location
Table 2: Phase-level location details for Blaiken wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Västerbotten County, Sweden[1] | 65.2604, 17.3144 (exact)[1] |
2 | Västerbotten County, Sweden[1] | 65.2697, 17.2057 (exact)[1] |
3 | Västerbotten County, Sweden[1] | 65.3019, 17.1294 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 https://web.archive.org/web/20240125152706/https://www.energimyndigheten.se/fornybart/vindkraft/vindlov/vindbrukskollen/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240131154921/https://www.fortum.com/media/2017/09/blaiken-groundbreaking-arctic-wind-farm-project-inaugurated. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)