Bleka wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Bleka wind farm is a cancelled wind farm in Fjällsjö District, Jämtland County, Sweden.

Project Details

Table 1: Phase-level project details for Bleka wind farm

Status Nameplate capacity Type Owner Operator
Cancelled[1] 100 MW[1] Onshore[1] WPD Europe GMBH [100%][2] WPD Scandinavia AB[1]

Location

Table 2: Phase-level location details for Bleka wind farm

Location Coordinates (WGS 84)
Fjällsjö District, Jämtland County, Sweden[1] 63.8791, 16.1667 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240125152706/https://www.energimyndigheten.se/fornybart/vindkraft/vindlov/vindbrukskollen/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20220325122104/https://www.wpd.se/aktuella-projekt/vindkraft-pa-land/bleka/. Archived from the original on 25 March 2022. {{cite web}}: Missing or empty |title= (help)