Bleka wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Bleka wind farm is a cancelled wind farm in Fjällsjö District, Jämtland County, Sweden.
Project Details
Table 1: Phase-level project details for Bleka wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Cancelled[1] | 100 MW[1] | Onshore[1] | WPD Europe GMBH [100%][2] | WPD Scandinavia AB[1] |
Location
Table 2: Phase-level location details for Bleka wind farm
Location | Coordinates (WGS 84) |
---|---|
Fjällsjö District, Jämtland County, Sweden[1] | 63.8791, 16.1667 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240125152706/https://www.energimyndigheten.se/fornybart/vindkraft/vindlov/vindbrukskollen/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220325122104/https://www.wpd.se/aktuella-projekt/vindkraft-pa-land/bleka/. Archived from the original on 25 March 2022.
{{cite web}}
: Missing or empty|title=
(help)