Bleka wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Bleka wind farm is a cancelled wind farm in Fjällsjö District, Jämtland County, Sweden.

Project Details

Table 1: Phase-level project details for Bleka wind farm

Status Nameplate capacity Type Owner Operator
Cancelled[1] 100 MW[1] Onshore[1] WPD Europe GMBH[2] WPD Scandinavia AB[1]

Location

Table 2: Phase-level location details for Bleka wind farm

Location Coordinates (WGS 84)
Fjällsjö District, Jämtland County, Sweden[1] 63.8791, 16.1667 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Vindbrukskollens Karttjänst (Vindbrukskollen's Map Service)". Energimyndigheten (The Swedish Energy Agency). February 18, 2022. Archived from the original on February 22, 2022. Retrieved February 22, 2022.
  2. https://www.wpd.se/aktuella-projekt/vindkraft-pa-land/bleka/. {{cite web}}: Missing or empty |title= (help)