Bluestone National Park Resort Canaston Wood solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Bluestone National Park Resort Canaston Wood solar farm is a solar photovoltaic (PV) farm in pre-construction in Dyfed, Wales, United Kingdom.

Project Details

Table 1: Phase-level project details for Bluestone National Park Resort Canaston Wood solar farm

Status Nameplate capacity Technology
Pre-construction[1] 4 MW[1] PV[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Bluestone National Park Resort Canaston Wood solar farm

Location Coordinates (WGS 84)
Dyfed, Wales, Wales, United Kingdom[1] 51.7866, -4.7968 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240327051815/https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract. Archived from the original on 27 March 2024. {{cite web}}: Missing or empty |title= (help)