Bo-Kenema solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Baoma-1 (Phase 1), Bo-Kenema Solar Pv 2 (Phase 2)
Bo-Kenema solar farm is an operating solar photovoltaic (PV) farm in Yamandu, Sierra Leone.
Project Details
Table 1: Phase-level project details for Bo-Kenema solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2022[1] | 5 MWp/dc[1] | PV[1] | Serengeti Energy [100%][1] |
2 | Announced[1] | – | 20 MWp/dc[2] | PV[2] | ResponseAbility; Africa Growth and Energy Solutions[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bo-Kenema solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Yamandu, Sierra Leone[4] | 8.1869, -11.7970 (approximate)[4] |
2 | Bo District, Southern, Sierra Leone[5] | 7.9544, -11.7360 (approximate)[5] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240201092027/https://www.afrik21.africa/en/sierra-leone-baoma-1-solar-pv-plant-goes-live-as-a-ppp/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20220324161806/https://www.esi-africa.com/industry-sectors/future-energy/25mw-solar-pv-project-to-boost-sierra-leones-bo-district/. Archived from the original on 24 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.esi-africa.com/industry-sectors/future-energy/25mw-solar-pv-project-to-boost-sierra-leones-bo-district/ https://www.esi-africa.com/industry-sectors/future-energy/25mw-solar-pv-project-to-boost-sierra-leones-bo-district/, https://www.esi-africa.com/industry-sectors/future-energy/25mw-solar-pv-project-to-boost-sierra-leones-bo-district/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://maps.app.goo.gl/RXwNJHFTdqsnLPmS9 https://www.afrik21.africa/en/sierra-leone-baoma-1-solar-pv-plant-goes-live-as-a-ppp/, https://maps.app.goo.gl/RXwNJHFTdqsnLPmS9.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.esi-africa.com/industry-sectors/future-energy/25mw-solar-pv-project-to-boost-sierra-leones-bo-district/ https://en.wikipedia.org/wiki/Bo_District, https://www.esi-africa.com/industry-sectors/future-energy/25mw-solar-pv-project-to-boost-sierra-leones-bo-district/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)