Boleadoras-Punta Loyola Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

The Boleadoras-Punta Loyola Oil Pipeline is an oil pipeline in Argentina.

Location

The pipeline runs from the Boleadoras oil field to the Punta Loyola Terminal in Santa Cruz province, Argentina.[1][2][3][4]

Loading map...

Project details

  • Operator: CGC (Compañía General de Combustibles)[5][6]
  • Owner: CGC (Compañía General de Combustibles)[5][6]
  • Parent company: CGC (Compañía General de Combustibles)[5][6]
  • Capacity: 5300 m3/day[1]
  • Length: 183 kilometers[1]
  • Diameter: 8 inches, 10 inches[1][2]
  • Status: Operating
  • Start year:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "Logística de Hidrocarburos en Argentina (p 24)" (PDF). Facultad de Ingeniería - UNLP (Universidad Nacional de La Plata). March 2016.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 "Oleoductos Principales Cuenca Austral (p 3)" (PDF). Petrobras. Retrieved 2023-03-28.{{cite web}}: CS1 maint: url-status (link)
  3. "Upstream - CGC Español". CGC Español - Compañía General de Combustibles. Retrieved 2023-03-29.
  4. "Prospecto de Actualización Régimen de Emisor Frecuente (pp 12-13)". CGC (Compañía General de Combustibles S.A.). May 27, 2021.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 5.2 "Dictamen firma conjunta (pp 1-2)" (PDF). República Argentina - Poder Ejecutivo Nacional. March 19, 2018.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 6.2 "1.4 Estudios de Ductos y Otras Líneas de Conducción, Redes y Caminos (p 51)" (PDF). Estudios y Servicios Ambientales SRL. March 2022.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles