Boleadoras-Punta Loyola Oil Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
The Boleadoras-Punta Loyola Oil Pipeline is an oil pipeline in Argentina.
Location
The pipeline runs from the Boleadoras oil field to the Punta Loyola Terminal in Santa Cruz province, Argentina.[1][2][3][4]
Project details
- Operator: CGC (Compañía General de Combustibles)[5][6]
- Owner: CGC (Compañía General de Combustibles)[5][6]
- Parent company: CGC (Compañía General de Combustibles)[5][6]
- Capacity: 5300 m3/day[1]
- Length: 183 kilometers[1]
- Diameter: 8 inches, 10 inches[1][2]
- Status: Operating
- Start year:
Background
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "Logística de Hidrocarburos en Argentina (p 24)" (PDF). Facultad de Ingeniería - UNLP (Universidad Nacional de La Plata). March 2016.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 "Oleoductos Principales Cuenca Austral (p 3)" (PDF). Petrobras. Retrieved 2023-03-28.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Upstream - CGC Español". CGC Español - Compañía General de Combustibles. Retrieved 2023-03-29.
- ↑ "Prospecto de Actualización Régimen de Emisor Frecuente (pp 12-13)". CGC (Compañía General de Combustibles S.A.). May 27, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 5.2 "Dictamen firma conjunta (pp 1-2)" (PDF). República Argentina - Poder Ejecutivo Nacional. March 19, 2018.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 6.0 6.1 6.2 "1.4 Estudios de Ductos y Otras Líneas de Conducción, Redes y Caminos (p 51)" (PDF). Estudios y Servicios Ambientales SRL. March 2022.
{{cite web}}
: CS1 maint: url-status (link)