Bolivar PV Solar Forest
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Bosques Solares De Bolivar (Phase 505)
Bolivar PV Solar Forest (Bosques Solares Bolivar) is an operating solar photovoltaic (PV) farm in Atlantico, Colombia.
Project Details
Table 1: Phase-level project details for Bolivar PV Solar Forest
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
500 | Construction[1] | 2023 (planned)[2] | 20 MWp/dc[3] | PV[4] | SolarGreen [100%][5] | ISAGEN Energía Productiva[1] |
501 | Construction[1] | 2023 (planned)[2] | 20 MWac[3] | PV[2] | SolarGreen [100%][5] | ISAGEN Energía Productiva[1] |
502 | Construction[1] | 2023 (planned)[2] | 20 MWac[3] | PV[2] | SolarGreen [100%][5] | ISAGEN Energía Productiva[1] |
503 | Construction[1] | 2023 (planned)[2] | 20 MWac[3] | PV[2] | SolarGreen [100%][5] | ISAGEN Energía Productiva[1] |
504 | Construction[1] | 2023 (planned)[2] | 20 MWac[3] | PV[2] | SolarGreen [100%][5] | ISAGEN Energía Productiva[1] |
505 | Operating[6] | 2023[7] | 19.9 MWac[2] | PV[2] | – | Empresa De Energia Del Pacifico SA[7] |
506 | Operating[6] | 2021[6] | 19.9 MWac[2] | PV[2] | – | Empresa De Energia Del Pacifico SA[8] |
507 | Operating[6] | 2021[6] | 19.9 MWac[2] | PV[2] | – | Empresa De Energia Del Pacifico SA[9] |
509 | Operating[6] | – | 19.9 MWac[2] | PV[2] | ISAGEN Energía Productiva [100%][2] | Trina Solar CO LTD (天合光能股份有限公司)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bolivar PV Solar Forest
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
500 | Atlantico, Colombia[3] | 10.6409, -75.0016 (approximate)[3] |
501 | Atlantico, Colombia[3] | 10.6409, -75.0016 (approximate)[3] |
502 | Atlantico, Colombia[3] | 10.6409, -75.0016 (approximate)[3] |
503 | Atlantico, Colombia[3] | 10.6409, -75.0016 (approximate)[3] |
504 | Atlantico, Colombia[3] | 10.6409, -75.0016 (approximate)[3] |
505 | Santa Rosa, Bolivar, Colombia[2] | 10.4455, -75.369 (approximate)[2] |
506 | Santa Rosa, Bolivar, Colombia[2] | 10.4455, -75.369 (approximate)[2] |
507 | Santa Rosa, Bolivar, Colombia[2] | 10.4455, -75.369 (approximate)[2] |
509 | Altamira, Huila, Colombia[2] | 2.0644, -75.788 (approximate)[2] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20240207165104/https://www.pv-magazine-latam.com/2023/03/30/en-colombia-comienza-la-construccion-del-proyecto-bosques-solares-de-bolivar-de-125-mwp/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 https://web.archive.org/web/20240125091849/https://www1.upme.gov.co/siel. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 https://web.archive.org/web/20240201163510/https://www.energiaestrategica.com/el-listado-estos-son-los-proyectos-que-participarian-de-la-subasta-de-renovables-de-colombia/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207093029/https://www.solargreen.com.co/proyectos_en.html. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20240201163945/http://www.solargreen.com.co/proyectos.html. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20240201163813/https://www1.upme.gov.co/siel/Informes_Registro_Proyectos_Generacion/Semana_23_2023.xlsx. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240206163329/https://www.power-technology.com/marketdata/power-plant-profile-bosques-solares-de-bolivar-505-solar-pv-park-colombia/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206174357/https://www.power-technology.com/marketdata/power-plant-profile-bosques-solares-de-bolivar-506-solar-pv-park-colombia/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206174539/https://www.power-technology.com/marketdata/power-plant-profile-bosques-solares-de-bolivar-507-solar-pv-park-colombia/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)