Bolsherechenskaya-Tarskaya Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Bolsherechenskaya-Tarskaya Gas Pipeline (Russian: Газопровод-отвод от ГРС «Большереченская» до ГРС «Тарская» Тарского района Омской области) is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to run from Bolsherechenskaya gas distribution station in Bolsherechye, Bolsherechensky District, Omsk Oblast to Tarskaya gas distribution station in Tara, Tarskiy District, Omsk Oblast, Russia.[1]
Project details
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity:
- Length: 94 km[2]
- Diameter: 325 mm[3]
- Status: Proposed[1][4]
- Start year: 2025[3]
- Cost:
- Financing:
- Associated infrastructure: Andreevskaya-Ingaly-Bolsherechenskaya Gas Pipeline, SRTO-Surgut-Omsk Gas Pipeline
Background
The pipeline was included in the gasification program of Gazprom for 2021-2025 for the Omsk region.[1]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Программа газификации 2021–2025 в Омской области". Gazprommap.ru. 2022. Retrieved Jul 20, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "ПЛАН МЕРОПРИЯТИЙ региональной программы газификации Омской области на 2021 – 2025 годы" (PDF). Омский Вестник. 2021-02-05. Retrieved 2022-08-05.
{{cite web}}
: line feed character in|title=
at position 17 (help)CS1 maint: url-status (link) - ↑ 3.0 3.1 "Постановление Правительства Омской области от 19.08.2009 N 156-п (ред. от 09.06.2021) "Об утверждении Схемы территориального планирования Омской области"" (PDF). investomsk.ru. 2009. Retrieved 2022-08-05.
{{cite web}}
: line feed character in|title=
at position 43 (help)CS1 maint: url-status (link) - ↑ "Как изменилась пятилетняя программа развития газоснабжения и газификации Омской области". ngs55.ru. 2023-06-04.
{{cite web}}
: CS1 maint: url-status (link)