Bolu Göynük Coal Mine is an operating coal mine in Göynük, Bolu, Türkiye.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Bolu Göynük Coal Mine Göynük, Bolu, Türkiye 40.245916, 30.797164 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating 2015

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
1[1] Surface 50* 281*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
27.76[1] Lignite Thermal Bolu Göynük power station

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Aksa Enerji Üretim A.Ş. Aksa Enerji Uretim AŞ [100%] Turkey

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM[1] 1[2] 1[3] 1[1]

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background on Project

Mining in the Bolu-Göynük lignite field was undertaken by the private sector until 1978, when the coalfield was nationalized.[4] In 1979, Göynük Linyitleri İşletmesi (Göynük Lignite Enterprise) or GÖLİ was established as a subsidiary of TKI to exploit the lignite reserves in the district.[5] However, GÖLİ was shut down in 2002 because of persistent financial loss.[6]

In 2006 Aksa Enerji, a subsidiary of Kazancı Holding, received the temporary operating rights for the Bolu Göynük mine from TKI for 30 years, to supply the coal demand from the future Bolu Göynük power station. This was the first contract signed between TKİ and a private company.[7] Construction for the power plant began in July 2012.[8][9] In 2015, the first year of operation of the power station, the mine produced 800 thousand tons.[7] In 2016, when the second unit became operational, the plant's consumption increased to 1,8 million tons per year.[10] In 2021, Aksa Enerji reported that the mine had 27.76 million tons in reserves.[11]

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 (PDF) https://aksaenerjicdn.mncdn.com/media/76012/aksa-enerji-2021-faaliyet-raporu.pdf. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://aksaenerjicdn.mncdn.com/media/76014/aksa-enerji-2019-faaliyet-raporu.pdf. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://aksaenerjicdn.mncdn.com/media/76013/aksa-enerji-2020-faaliyet-raporu.pdf. {{cite web}}: Missing or empty |title= (help)
  4. (2009) Dokuzuncu Kalkınma Planı 2007-2013 . Madencilik Özel İhtisas Komisyonu, 120. Report.
  5. (2002) 2001 Yıllık Faaliyet Raporu . Türkiye Kömür İşletmeleri Kurumu. Report.
  6. (2003) 2002 Yıllık Faaliyet Raporu . Türkiye Kömür İşletmeleri Kurumu, 13. Report.
  7. 7.0 7.1 (2016) 2015 Yılı Faaliyet Raporu . Aksa Enerji Üretim A.Ş.. Report.
  8. "Aksa Builds $319 Million Coal-Fired Plant With Bank Loans" Bloomberg, July 13, 2012.
  9. Aksa Bolu Göynük Termik Santrali Temel Atma Töreni, Aksa Enerji press release, July 13, 2012.
  10. (2018) 2017 Yılı Faaliyet Raporu . Aksa Enerji Üretim A.Ş.. Report.
  11. Aksa Enerji 2021 Faaliyet Raporu . Aksa Enerji Üretim A.Ş.. Report.