Borinquen geothermal power project (Central geotérmica Borinquen) is a geothermal power plant in pre-construction in Liberia, Guanacaste, Costa Rica.
Project Details
Table 1: Unit-level project details for Borinquen geothermal power project
Unit name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1] | 2027 (planned)[2] | 55 MW[3] | Unknown type | Costa Rican Electricity Institute (ICE) [100%][4] | Costa Rican Electricity Institute (ICE)[4] |
2 | Pre-construction[5] | 2027 (planned)[5] | 55 MW[3] | Unknown type | Costa Rican Electricity Institute (ICE) [100%][3] | Costa Rican Electricity Institute (ICE)[3] |
Location
Table 2: Unit-level location details for Borinquen geothermal power project
Unit name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Liberia, Guanacaste, Costa Rica | 10.6344, -85.4397 (approximate) |
2 | Liberia, Guanacaste, Costa Rica | 10.6344, -85.4397 (approximate) |
The map below shows the approximate locations of the geothermal power plant units:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240319061856/https://www.thinkgeoenergy.com/borinquen-geothermal-project-in-costa-rica-surpasses-40-completion/. Archived from the original on 19 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220307120019/https://www.thinkgeoenergy.com/wildlife-benefits-from-ecological-work-at-borinquen-geothermal-project/. Archived from the original on 07 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20220609004752/https://www.thinkgeoenergy.com/costa-rica-secures-234m-funding-for-borinquen-geothermal-project/. Archived from the original on 09 June 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20220418165212/https://www.thinkgeoenergy.com/costa-rica-postpones-development-of-borinquen-1-geothermal-project/. Archived from the original on 18 April 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20221206001404/https://revistasumma.com/costa-rica-proyecto-geotermico-borinquen-aumenta-conectividad-ecologica-en-liberia/. Archived from the original on 06 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)