Briska Gora solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Briska Gora solar farm is a solar photovoltaic (PV) farm in pre-construction in Ulcinj Municipality, Montenegro.

Project Details

Table 1: Phase-level project details for Briska Gora solar farm

Phase name Status Nameplate capacity Technology Owner
1 Pre-construction[1] 50 MWp/dc[2] PV[3] Elektroprivreda Crne Gore AD; Fortum Oyj[4][4]
2 Pre-construction[1] 190 MWp/dc[5] PV[3] Elektroprivreda Crne Gore AD; Fortum Oyj[4][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Briska Gora solar farm

Phase Name Location Coordinates (WGS 84)
1 Ulcinj Municipality, Montenegro[6] 41.9291, 19.2135 (approximate)[6]
2 Ulcinj Municipality, Montenegro[6] 41.9291, 19.2135 (approximate)[6]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240201212405/https://ceelegalmatters.com/law-office-vujacic/20885-montenegro-ongoing-and-future-energy-projects. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240201212434/https://www.cdm.me/english/briska-gora-will-be-twice-as-bigger-as-previously-planned/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240207130512/https://www.altenergymag.com/news/2022/05/31/on-6-8th-september-2022-the-high-level-international-investment-event-energy-week-western-balkans-will-take-place-in-montenegro/37362. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240206210219/https://renewablesnow.com/news/construction-of-200-mw-solar-plant-in-montenegro-to-kick-off-in-2020-econ-min-701778/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. https://web.archive.org/web/20240402052142/https://wiki-solar.org/. Archived from the original on 02 April 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://web.archive.org/web/20240206224642/https://balkangreenenergynews.com/montenegro-expands-pv-plant-briska-gora-to-262-mw-in-spatial-plan/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)