Brule Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Brule Coal Mine is an operating coal mine in Chetwynd, British Columbia, Canada.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Brule Coal Mine | Chetwynd, British Columbia, Canada[1] | 55.38667, -121.82 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating[2] | – | 2004[1] | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
– | 1.651[3] | 2022[3] | Surface[1] | Open Pit[1] | 35.24[4] | 60* | 170[5] |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
2.3[6] | – | – | – | Bituminous | Thermal & Met[4] | Ridley Terminal[7] |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
ERP Compliant Fuels[2][8] | ERP Compliant Fuels | USA |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM[9] | 2.33[9] | 2.6[6] | 2.6[6] | 2.1[10] | 1.6[11] | 1.651[12] | 1.6[13] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.
Background
The Brule mine is an open-pit mine situated between the towns of Chetwynd and Tumbler Ridge in northeast British Columbia, Canada.[14] It is owned and operated by Conuma Resources, a subsidiary of West Virginia-based ERP Compliant Fuels.
Brule initially operated from 2004 to 2014, when it was under the ownership of Western Coal, a subsidiary of Walter Energy.[14] The mine then went into care and maintenance, due to low coal prices.[15]
In 2016, Conuma Coal Resources acquired the Brule mine, along with the nearby Wolverine and Willow Creek coal mines, from Walter Energy Ltd. Brule was reopened under this new owner in September 2016.[15]
The mine produces approximately 1.5 million tonnes of ultra-low volatile pulverized coal injection (ULV-PCI) coal for steelmaking.
End of Mine Life
Due to its mineable deposits becoming exhausted, operations at the Brule mine reportedly began winding down in 2024.[16] According to the British Columbia Ministry of Mining and Critical Minerals, the mine is expected to be placed on care and maintenance in 2025.[17]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 (PDF) https://web.archive.org/web/20240816173059/https://www.miningnewsfeed.com/reports/annual/Brule_2017_Annual_Reclamation_Report.pdf. Archived from the original (PDF) on 16 August 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240718162930/https://conumaresources.com/what-we-do/. Archived from the original on 18 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20241003072128/https://www2.gov.bc.ca/assets/gov/farming-natural-resources-and-industry/mineral-exploration-mining/documents/reports/annual_report_of_the_chief_inspector_of_mines_2022-2023.pdf. Archived from the original (PDF) on 03 October 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20110916235930/http://www.walterenergy.com/operationscenter/westerncoal/brule.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240121000743/https://mineralsed.ca/learning-resources/bc-mineral-resources-map/bc-operating-mine-profiles/brule-mine/. Archived from the original on 21 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://web.archive.org/web/20230923081644/https://miningdataonline.com/error/500.html?aspxerrorpath=/property/profile.aspx. Archived from the original on 23 September 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240121033735/https://projects.eao.gov.bc.ca/api/document/5886f734a4acd4014b820c86/fetch. Archived from the original on 21 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240722230538/https://www.e-mj.com/news/this-month-in-coal/conuma-coal-reopening-willow-creek-in-british-columbia/. Archived from the original on 22 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://minfile.gov.bc.ca/report.aspx?f=PDF&r=Production_Detail.rpt&minfilno=093P++007.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://cmscontent.nrs.gov.bc.ca/geoscience/publicationcatalogue/InformationCircular/BCGS_IC2021-02.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://cmscontent.nrs.gov.bc.ca/geoscience/PublicationCatalogue/InformationCircular/BCGS_IC2022-01.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://minedocs.com/24/ConumaResourcesLtd_SustainabilityReport_2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://cmscontent.nrs.gov.bc.ca/geoscience/PublicationCatalogue/InformationCircular/BCGS_IC2024-01.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 "Brule", Walter Energy website, Archived from the original on 16 September 2011, Accessed November 2023.
- ↑ 15.0 15.1 Conuma Coal Resources Limited 2017 Annual Reclamation Report: Brule Mine, Conuma Resources, Accessed November 2023.
- ↑ Bennett, Nelson,"B.C.'s Tumbler Ridge seeing steelmaking coal revival", North Shore News, 25 February 2025.
- ↑ Provincial Overview of Exploration and Mining in British Columbia, 2024, Ministry of Mining and Critical Minerals British Columbia Geological Survey, January 2025.